20xx人教新目标版英语九年级unit11sadmoviesmakemecrysectionb3a-selfcheck导学案内容摘要:

五个“ W ”( what, who, when, where, why )和一个“ H ” (how)。 人称应是第一人称,时态应是一般过去时为主。 例文: A Happy Thing After school this afternoon, on my way home I met two Americans who lost their way. They fot the way to the hotel where they stayed. As I knew where the hotel was, I decided to take them there. On the road, we talked a lot. I told them about the great changes in the city. They told me something about the American youth as well. When they arrived, they thanked me a lot. That made me very happy. Because I not only helped two foreigners, but also realized the importance of learning a for。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。