家用电器
. Approval must be obtained from the customer in case the methods other than the standards are adopted. 所有试验规程、操作规程以及所需技术规范等均须在测试现场易于得到,供试验人员使用。 All the test procedures, operation regulations and
The operation instructions shall be formulated under the anization of the Equipment Section of Manufacturing Department. The operator shall observe the operation instructions and keep the equipment
stics as indicated in customer drawings, and the roles, effects and control requirements of each operational procedure during product creation, the Manufacturing Department shall preliminarily
he department using the forms shall inspect the quality records every month and determine if they are in pliance with the facts. Each functional department is responsible to collect and trim the
各级人员的职责与权限之规定列入“岗位规范”文件中。 佛 山市威利宝家用电器有限公司 质量手册 章号 5 实施日期 20xx41 标题 管理职责 页数 8/11 B 版第 0 次修改 质量管理职能对照表(主要责任部门 O 关联责任部门) ISO9001 条款 要求事项 总经理 管代或质质 销售部 生产部 技术部 供应部 行政部 研发部 质量管理体系 总要求 ● ○ ○ ○ ○ ○ ○ ○
安全总结工作,提出整改意见和防范措施,杜绝事故发生。 三、安全员岗位职责 具体负责相应区域(车间车辆、设备操作等)的安全管理、宣传工作。 每日巡查相应区域的安全生产情况,定期检查维护生产设备、消防器材、电路,确保设备器材的正常使用及安全完好,及时纠正解决安全隐患,落实整改措施。 了解管辖区域的安全生产情况,定期向安全生产领导小组汇报安全生产情况。 及时汇报突发事故
kaging). 已批准产品的 DFMEA(产品组成、成分等级)以外部分的更改。 Changes of other parts excluding the DFMEA of approved products (product position, position grade). i. 试验 /检验方法的更改 新技术的采用(不影响接受准则)。 Change of test/inspection
司 分公司 分公司 门店 门店 门店 门店 表,针对具体项目和门店进行说明(分公司所属门店由分公司自行要求),对于原则与方法上发生的差 异,附上改良建议或者计划。 每个季度季末做行政费用总结,包括费用差异分析,行政费用改良情况及效果,下季度费用规划。 ( 3) 由行政管理中心对分公司相关人员进行行政费用体系的培训,并积极促进各分公司之间的交流,对全公司整个行政费用体系进行修正和改良。 ( 4)
查主要内容 安全生产管理制度和安全操作规程贯彻执行情况。 查工伤事故是否及时上报,是否做到“三不放过”,即:事故原因未查清不放过;事故本人和其他员工未受到教育不放过;没有制定出切实可行的防范措施不放过。 查设备、设施及各种防护装置是否齐全、完整、完好,要害部位(空压机、压力容器、起重机械、化学危险品等)管理是否严格,以及防尘防毒工作情况。 查劳动防护用品是否按规定穿戴。 查有否违章作业,违章指挥
财务部 管理人员 28% 21% 21% 70% 15% 15% 员工 28% 21% 21% 70% 30% 经理办 管理人员 40% 10% 10% 60% 15% 25% 员工 40% 30% 30% 100% 证券办 管理人员 40% 10% 10% 60% 15% 25% 员工 40% 30% 30% 100% 附件 3: 工作绩效考核实施细则表 市场部正副部长