某家用电器公司0905设备管理控制程序-设备管理(编辑修改稿)内容摘要:
The operation instructions shall be formulated under the anization of the Equipment Section of Manufacturing Department. The operator shall observe the operation instructions and keep the equipment in good maintenance and repair. b. 必须对操作工进行知识和技能的培训,经考核合格持证上岗。 To improve knowledge and skills, the operators must be provided with necessary training. Only those holding qualification certificates are allowed to work on relevant posts. c. 做好年度维修、保养计划,按计划做好维修保养工作。 Work out annual repair and maintenance planning, and carry out the repair and maintenance as scheduled in the planning. d. 必要时对过程参数进行连续监控。 If required, the process parameters should be monitored continuously. 设备保养维修控制 Equipment Repair amp。 Maintenance Control 由制造部设备部门根据设备运行情况、过程控制图反映的工序稳定性,制造商的建议等制订设备保养维修计划,根据保养工作量和难易程度,分为日常保养、一级保养(小修)、二级保养(中修)、三级保养(大修),设 备管理人员负责验收及记录。 The Equipment Section of Manufacturing Department shall formulate Equipment Repair amp。 Maintenance Planning by considering the equipment operation, process stability as revealed in the process control drawing, and the manufacturers’ proposals. According to the workloads and difficulties, the maintenance is classified into four levels, . Routine Maintenance, 1st Level Maintenance (minor repair), 2nd Level Maintenance (medium repair) and 3rd Level Maintenance (major or overhaul repair). 日 常维护保养 Routine Maintenance a. 操作人员每日上班先根据《设备日常点检卡》之要求对设备进行保养,下班前清扫周边环境,擦拭机械设备。 Before starting the job each day, the operators shall carry out proper maintenance as required in “Routine SpotCheck Card”. Before finishing the job, the operators shall clear the space around and wipe the equipment clean. b. 设备日常运作出现故障时,由使用部门开出工作委托单交设备维修人员处理,设备维修人员接单后安排维修工进行维修。 维修结束后,使用部门进行验收,验收合格后,针对故障在《设备履历卡》上作记录。 In case the equipment is found to fail during daily operation, the operating department shall issue a Job Bill and submit it to the maintenance personnel. At receipt of the Job Bill, the maintenance personnel shall assign proper repairman to make repairs. After pleting the repair, the operating department shall make an inspection. If the repair proves acceptable, the troubles will be recorded in Equipment History Sheet. 维修保养 Maintenance amp。 Repair a. 设备维修人员每年制定《设备年度检修计划》,报部长批准后执行。 计划检修:一级保养(小修),二级保养(中修)由相关部门填写工作委托单交设备维修人员维修,三级保养(大修)可由 制造部设备科 托外修理。 The equipment maintenance personnel shall formulate Equipment Annual Repair Planning each year and submit it to the Department Manager for approval. Scheduled Repair: Subject to the Job Bill issued by the department concerned, 1st Level Maintenance (Minor Repair) and 2nd Level Maintenance (Medium Repair) can be done by the equipment maintenance personnel. 3rd Level Maintenance (Major Repair) might be outsourced by the。某家用电器公司0905设备管理控制程序-设备管理(编辑修改稿)
相关推荐
. Approval must be obtained from the customer in case the methods other than the standards are adopted. 所有试验规程、操作规程以及所需技术规范等均须在测试现场易于得到,供试验人员使用。 All the test procedures, operation regulations and
调项目组有关人员或 归口 部门指定联系人必须及时与顾客沟通、联络,识别和明确顾客的特殊要求,并由横向协调项目 经理 登记在《顾客特殊要求一览表》上。 本 资料来自 When it is required to conduct advanced product quality planning and establish control plans under the occasions of
he department using the forms shall inspect the quality records every month and determine if they are in pliance with the facts. Each functional department is responsible to collect and trim the
stics as indicated in customer drawings, and the roles, effects and control requirements of each operational procedure during product creation, the Manufacturing Department shall preliminarily
ing, a. 新增设施、设备、工装 /量具 /检测设备清单; the list for additional facilities, equipment, tooling/gauge/test equipment. b. 外协、外制件明细表以及原材料清单; the list for outsourcing parts and raw materials 并由相关部门形成申请和采购 /制作计划
ded to D. was able to 21. _____ repeat the question? A. Shall I B. Will I C. Would you like that I D. Do you want that I 22. Since the ground is wet, it ______ last night. A. should have rained B.