plc
bee one of the important transportation equipment. The design mainly PLC (PLC) and puter application to the elevator control system, and to fivestory elevator as an example to plete a single lift PLC
al also very quickly know and go deep into to the PLC. Is PLC one of the advantage above and only, this is also one part that the people prehend more and easily, in a lot of equipmentses, the people
to K1, M50 Reaction of the empty bottles in the short position, and detect the location of the motor speed to go on the frequency shift in the corresponding unit within the builtin 1 or 0, control
硬件系统 主要 由 PLC、 A/D转换模块 、 变频 器、潜水泵和灯光 组成。 通过 PLC对外部音频信号的采样、转换来控制变频器和故态继电器的动作,从而 达到控制系统的要求,并能够实现对音乐和喷泉的实时的完美结合。 音乐喷泉控制系统硬件组成部分如图。 18 图 音乐喷泉控制系统硬件结构图 系统的控制过程 在这里,输入转换电路是指能对乐曲启停、乐曲节奏和声音强弱等进行检测并将检到的信号以电平
diagram that the adoption is original after the electric appliances to control, make the electrical engineering teacher while weaving to write the procedure very easy prehended the PLC language, and
运行控制、轿内指令、层站召唤、安全保护信息、光电脉冲、开关门及限位信号、门区和平层信号等。 输出信号有呼梯信号指示、楼层显示、运行方向指示等。 P L C输入接口输出接口内 指 令 信 号外 指 令 信 号光 电 脉 冲运 行 方 式 选 择 运 行 控 制 信 号呼 梯 信 号 指 示楼 层 显 示运 行 方 向 指 示开 关 门 信 号 门 区 或 平 层 信 号 拖 动 控 制 信 号开
(3)数据采集、分析处理。 如控制中的数据采集、算术运算、函数运算、逻辑运算、数据传输、转换、捧序和查表等操作。 综上用 PLC 作为控制系统控制 机械手 写字 的设计是一种方便、实用、可靠的控制系统设计方案。 通过收集各种资料和初期的规划我已对将要进行的设计非常了解,相信在老师的指导和我自己的努力下我可以很好的完成设计任务,虽然期间肯定会遇到这样或那样的困难,但是我有信心做好这一切。
串并联等术语,所不同的是,梯形图中每个元件的名称和编号有PLC 的特别规定;同一编号继电器的触点(既有常开又有常闭)可以根据需要无限引用;所有触点及其构成的控制回路都是通过软件编程实现其功能的,并无实际连线;此外梯形图中所有的输出元 素都是安排在右侧与母线相连,图中每包含一个被控元素的逻辑段称为一个梯级。 梯形图中继电器的线圈、常开触点及常闭触点符号常用下图中的符号表示。 梯形图比较形象、直观
厢在运行中偏斜或摆动。 常闭块式制动器在电动机工作时松闸,使电梯运转,在失电情况下制动,使轿厢停止升降,并在指定层站上维持其静止状态,供人员和货物出入。 轿厢是运载乘客或其他载荷的箱体部件,对重用来平衡轿厢载荷、减少电动机功率。 补偿装置用来补偿曳引绳运动中的张力和重量变化,使 曳引电动机负载稳定,轿厢得以准确停靠。 电气系统实现对电梯运动的控制,同时完成选层、平层、测速、照明工作。
mistake creates, PLC the outside should install the essential protection circuit. (1) Stops the electric circuit anxiously. Regarding can cause the user to cause the damage the dangerous load,