20xx人教新目标版英语九年级unit12lifeisfulloftheunexpectedsectiona1a-2d导学案内容摘要:

经完成或结束。 其结构为“ had+动词的过去完成时”。 2).by the time 意为“到 „„ 时候”,引导时间状语从句,常与过去完成时连用。 [即学活用 ] — By the time I was five, I ____English. — Really? A. had started learning B. have started learning C. started to learn D. started learning 【解析】 by the time 所引导的从句是一般过去时,其主句要用过去完成时。 五 、 达标测评 1. By the time I_______ into the store, someone________ the jeans I wanted. A. walked: walked bought B. walked: bought C. had walked: had bought D. had walked: bought 2.。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。