(人教版)新目标八年级下册ppt课件 Unit 5 Section A-1内容摘要:

1、2016/11/30 该课件由【语文公社】2016/11/30 该课件由【语文公社】2016/11/30 该课件由【语文公社】I in a 2016/11/30 该课件由【语文公社】I on 2016/11/30 该课件由【语文公社】I my in my 2016/11/30 该课件由【语文公社】I at 2016/11/30 该课件由【语文公社】1a at of in 1. _ I in 2. _ I in my 3. _ I on 4. _ I at b d c a 2016/11/30 该课件由【语文公社】s 2016/11/30 该课件由【语文公社】1b to V a. my b. c 2、. to d. 016/11/30 该课件由【语文公社】at at by at of 2016/11/30 该课件由【语文公社】_. at of 016/11/30 该课件由【语文公社】_. at of 016/11/30 该课件由【语文公社】1c a at of A: at of B: 2016/11/30 该课件由【语文公社】2a 1 2 3 4 5 2016/11/30 该课件由【语文公社】2b in in a. 2016/11/30 该课件由【语文公社】I _ so _ t a I _ it to I _ to y t go _ up I a _ 016/11/30 该课件由【语文公社 3、】2c a to in a a TV TV us TV 2016/11/30 该课件由【语文公社】2d I in my I at t 2016/11/30 该课件由【语文公社】 at I I a I I at t 2016/11/30 该课件由【语文公社】 at I at So s 2016/11/30 该课件由【语文公社】I so I So I 2016/11/30 该课件由【语文公社】1. My t go n. 闹钟 我该把闹钟拨到几点钟响。 2016/11/30 该课件由【语文公社】2. I it to 1) v. (开始 Ill re 你什么时候准备好我就开始。 常用的句型: to 般来说, to 以互换,但在以下三种情况下,用 to 2016/11/30 该课件由【语文公社】主语不是指人,而是 如: It to 如:to 还有 避免重复后接 to 即: to 016/11/30 该课件由【语文公社】2) 在很大程度上;大量地 力地移动 It 雨下得很大。 3. 突然;忽然 I t 我忽然想起没有锁门。 2016/11/30 该课件由【语文公社】4. s 奇特的,奇怪的; 不可思议的 a 怪的声音 Hes its ve 他经常在这,你却没有见过他,真 是不可思议。 2016/11/30 该课件由【语文公社】5. I at t up 接电。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。