阅读
• • +寻读 • +边读问题 , 边读文章 解题方法 • 4个选项之间的区别 . • . • . • ,善于抓关键词、关键句 . • 和观点 . • 6. 不同的题型采用不同的对策 . 猜测词义型 常见的设题方式有 : • word________could best be replaced by________. • of the following is closest in
are very unusual birds. They are funnylooking,like little men with black suits and white shirts. They are very friendly, and they are not afraid of people. They can swim very well. But they have very
blue eyes entered the beautiful hall of the Bell Tower Hotel in Xi’an with his bicycle. The hotel workers received him and phoned the manage, for they had never seen a bicycle in the hotel in the
解题技巧 (2) “It’s really a hard job for me. I won’t enter for such petition any more. Anyhow, I am quite lucky. I am also glad to have had more chance to work for the social welfare since I won the
例如: ( 1) 比喻 :比喻要贴切,必须有相似点。 本体与喻体的相似点越明显,越突出,比喻就越贴切。 比喻的作用就是使深奥的道理浅显化,抽象的道理形象化,或者具体形象生动地突出本体的什么特点,从而增强文章的趣味性、生动性。 ( 2) 拟人 :使物具有人的某种情感,便于抒发某种感情。 如果在人称上将物说成 “ 你 ” 等,不仅具有使物具有人的某种情感,便于抒发某种感情
感悟体验型 品析评价型 (三)现代文阅读 考题走向 重在对考生阅读基本能力的考查 重视学生对阅读材料的个性化表达 加强对考生在语言实际运用能力方面的考查 淡化文体知识的考查 考查内容 概括文章内容、领悟文章主旨 理清行文思路 根据文段内容,推敲词句 对词语或语句进行点评或赏析 l整体感知,理清思路。 l紧扣语境,品味语言。 分析人物形象,指出人物的个
3. How many coal fires are there in the world? A. There39。 s only one. B. It39。 s hard to say. C. There are 260. D. The article(文章) doesn39。 t tell us. 4. What’s one of the best ways to put out (扑灭)
c food , 词组 “ the anic trend”的意思是 不断增长的对有机食品的兴趣 , 故答案选 A。 同义词猜义 [例 1] He replied quickly. But after he considered the problem more carefully, he regretted having made such a hasty decision. [例 2] The
n men. The number is said to be as high as 60% in Germany. “Women often wish they had the same chances as men have, and think it is still men’s world,” said Dr James Helen, one of the sociologists
实际上上面的三个角就是这个三角 的三个内角,请大家将刚的测量结 果计算一下,看是否刚好是 180度呢。 计算三个内角的和,得到的结果未必全是 180度,可能有的会比 180度大些,有的会比 180度小些。 如果观察细致,仪器精确,不产生误差,需要证明吗。 仅通过观察、试验等就下结论有时也缺乏说服力。 例如,即使不考虑误差等因素,当上面观察的所有结果全是 180度时,人们还会有疑问:“