外文
vidual consumer preferences together with their production process and system of planning will be a decisive factor in the field of petition. The solution of the problem with individual client orders
benefit is quite considerable. Recently, many word famous IT enterprises have regarded reverse logistics strategy as the primary means of petition advantage. For instance, Sun Microsystems possesses
he posite system could be used for effective organic wastes mineralization or as a feasible detoxification and color removal pretreatment stage for biological post treatment. Author Keywords:
___ Organic matter content (%) Nitrogen content (%) Depth of soil Depth of soil Treatment 010 cm 1020 cm 2030 cm 010 cm 1020 cm 2030 cm ________________________________________________________________
r. Food is organic in nature, having an animal or plant source. One characteristic of such organic matter is that, by and large, it has a limited natural biological life. A cut of meat, left to
The catalysts used are generally Group VIII metals such as cobalt or copper. The leaching of these metals into the aqueous phase is a difficulty that inhibits the general use of heterogeneous
to control the rebinant cell flow path in order to adapt to the metabolic state of the cell. Power control rebinant cell path can potentially lead to the increase in production will hinder growth
esults may be obtained by extra polation. The solutions of the toolbox equation often have geometric features like localized strong gradients. An example of engineering importance in elasticity is
本。 在用光学显微镜观察前用生理盐水( %Nacl)洗涤螨外部的饲料碎渣。 螨中肠的显微观察 在 Axioskop 复合显微镜利用 Axiovison 软件和 powershotA620 数码相机下观察中肠颜色的变化。 每个最小的方案每个物种每种指示剂包括 10个阳性观察。 不同于组织学研究,中结肠不能够 在观察中被识别出来。 此研究中,除了中结肠外,确定了前胃、盲肠
owever the main factor influencing variability of caro tenoid quality in juice has been shown to be geic diversity. Kato et al. showed that mandarin and orange juices accumμLated high levels of