外文
As a result, ROH attacked the carbon atom of HCOOCu, the intermediate of step (2), more slowly. But the spatial obstacle of 1butanol is the smallest among all butanols, and this is favorable to the
a result, ROH attacked the carbon atom of HCOOCu, the intermediate of step (2), more slowly. But the spatial obstacle of 1butanol is the smallest among all butanols, and this is favorable to the
定值时, 螺距补偿器使桨距角增加,从而使功率达到到额定值。 4 运用 转矩指令( setT )来计算功率 ( ordP ), 从而 为 转子侧变换器 提供励磁电流。 从控制器得到的最大 有功功率 ( maxP )受到图 1 所示 的 有功功率 限位块 的约束。 有功电流指令( pI )的计算 通过用发电机的端电压( termV ) 除以从风力涡轮机模型得到的中 ordP 而得。
ations varies widely. Many of these IED s are still useful but lack the most recent protocols. A munications processor that can municate with each IED via a unique baud rate and protocol extends the
period. Energy crisis in early 70s driven the US postal service placed a large order of 350 EV test fleet. It is the highest node of midterm development. However, partly due to limited performance,
s: the use of leadacid batteries, nickel cadmium battery, the battery, sodium sulfide sodium sulfide lithium battery, the battery, the battery, the flywheel 3 zinc air fuel cell and solar battery,
he period. Energy crisis in early 70s driven the US postal service placed a large order of 350 EV test fleet. It is the highest node of midterm development. However, partly due to limited performance
y taking into consideration the power, the cache, the reliability of each node in a routing. QoS requirements of services from high layer such as the bandwidth and the delay, and implementation
erometer output voltage (mV) and are under the acceleration than。 The latter is accelerometer output charge and are under the ratio of acceleration. Acceleration unit for m/s2, but in vibration
是否修改数据: Whether revise the data or not 是否给予修改: Whether allow revising the data or not 回复会员数据修改成功的信息: Reply to member that the data is successfully revised 回复会员数据不予修改信息: Reply to member that the data