高中英语
so as to B. such that C. so D. because 6. My friend May was very sick with a fever. _______, she could neither eat nor sleep. A. As a result B. After all C. Any way D. Otherwise 7. __________ his
arlotte Mason’s three mottos? A. Children should be confident and responsible. B. Parents should give children a good study environment. C. Parents should be strict and serious about children’s
and learn about the styles of a play. 2. Ask the students to scan the text and do Part C1. 3. Ask the students to skim the text to confirm their prediction in the “Brainst orming” section. 4.
st. The two continents were once connected. 经典短语透视 【短语 1】 in danger 【点拨】 in danger 意为 在危险中。 如 : The patient is in danger and the doctors are trying to save him. Some wild animals are in danger. 【上层楼】
It makes you realize how _________ Emperor Qin Shihuang was. ZL: Yes, indeed. And each of them has an individual _____ so that archaeologists think they must have been a _____ of Qin Shihuang’s real
It was the experiment that my father did in the lab yesterday evening. 强调时间: It was yesterday evening that my father did the experiment in the lab. (注意不用 when) 强调地点: It was in the lab that my father
Please sound the bell and ask them to e in. (7) 我在花园里种的植物现在越长越高。 The plant which I grew in my garden is growing higher and higher. Step 6 Consolidation (Summarize the usage of linking verbs) 1. seem:
tch the words with the correct meanings. 2. Fill in the blanks using the new words in the text. 1) I’m s________ of his ability to finish the task. He seems so c areless. 2) One of the greatest
lusion. Step 4 Careful reading for detailed information (PPT 1215) Tell students to read the two speeches and see how they were developed. Get them to analyze the structure of each speech and find
ho value time regularly travel by aeroplane because of its speed. Second, travelling by plane is more fortable than by ship. With the improvement of technology, many airline panies offer excellent