教案m8u2内容摘要:

e new words. Step2: Work in pairs. Say what happened next in Goldilocks and the Three Bears. 1. I think Goldilocks decided to go home. 2. Maybe she stayed in the house. Step3: Read the next part of the story of Activity 2 and number the pictures in the correct order. keys: 2 4 5 1 3 Step4: Match the sentences with the pictures in Activity 2. 1. Goldilocks opened her eyes, jumped out of bed and hurried out of the house. 2. She tried the small chair. 3. The Three Bears returned to their house. 4. Baby Bear cried because there was nothing in his bowl and his chair was in pieces. 5. Baby Bear pointed at Goldilocks. She was asleep in his bed. keys: 1. (c) 2. (d) 3. (a) 4. (e) 5. (b) Step5: Check () the true sentences. ( ) 1. Goldilocks liked the big chair? (。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。