基础护理实验操作流程内容摘要:

tic and midsheet。 tuck the unwanted part under the mattress Take off the soiled midsheet。 brush the plastic sheet and lift on the patient Take off the soiled bottom sheet to the lower shelf of the nursing cart。 brush the mattress。 bespread sheets in order Roll the patient to the other side 21 Intravenous Infusion Tidy up after operation Tray, drugs, apparatus, tourniquet, bolster, fixative bandage, apparatus holder Move holder to bed Prepare drugs Prepare for infusion Insert the needle Prepare articles Check ?interpret Inquire upon defecation ? select vein 被套、带套床刷 Hang bottle on holder ?vent air in passway Put tourniquet and bolster in place Bind tourniquet ? sterilize skin? vent air again Ask patient to clench fist。 insert Fix apparatus on after being drops Regulate drops。 observe。 document Place bake tourniquet and bolster ? assist patient to be in a cosy position。 explain do’s and don’ts Smooth bed sheets ?dispose the soiled matters ?observe the patient and the drops Check Sterilize bottle closure。 check apparatus Join apparatuses。 shut off the regulator Insert a liitle more while blood present in the passaway 22 Prepare Standby Bed Slip on pillocase Bottom sheet, quiltcover, pillowcase badding, and pillow d Take articles to bed Bespread bottom sheet Bespread quilt cover Slip on quilt cover Prepare articles Move away the bedside table Move the chair to bed end。 place articles on the chair 被套、带套床刷 Perform on the chair Stand on right side of the bed。 place the pillow on bed backward the ward’s door Move back the bedside table and chair。 check the bed sheets Turn over and clean mattress and pad。 place back in order Bespread right part of bottom sheet。 wrap two corners Tuck the middle unwanted part。 bespread the left side Bespread left side to the bed end Shape cover into tubeshape along the bed two sides Bespread right side。 tuck the two ends under the pad Slip on cover to the two ends。 tie up 23 Prepare Anesthesia Bed Slip on pillowcase Bottom sheet, quiltcover, pillowcase, two plastic sheets, two midsheets, anesthesia tray, covered bed brush Take articles to bed Make bed Bespread quilt cover Slip on quilt cover Prepare articles Move away the bedside table Move chair to bed end。 place articles on chair Bespread the left side to the bed end Bespread the right part of the bottom sheet。 wrap the two corners Tuck the middle unwanted part Bespread the plastic sheet 4550cm off the bed head on the right Bespread midsheet。 tuck the unwanted part under pad Bespread the other plastic sheet and midsheet over bed head。 tuck unwanted part under the pad Bespread the other side in same order Perform on the chair Place pillow erect on the bed head towards the ward’s door Move back the bedside table and chair。 place the anesthesia tray on the table。 move the chair to the bed end on the side with the quilt Slip on the cover to bed end。 tie up Pull down the quilt 15cm。 fold inward the two sides into tubeshape。 fold inward the quilt end along the bed end Fold up 3 times with opening towards the door Turn over and clean mattess ad pad。 place back in order → 平卧薪尝卧薪尝 24 Enema Tidy up after the operation In the tray: enema bucket, kidneybasin, anal tube, bumf, cotton swab, Vaseline, rubber sheet, rubber napkin, disposable rubber glove Prepare enema solution Take articles to bed Prepare for enema Enema Prepare articles Pour 1 2% soap solution or 500 100ml NS into the enema bucket Test the water temperature Demand the patient to hold on for 510 minutes and then evacuate into the container or in the toilet Take off the rubber sheet and napkin。 smooth the bed sheets。 fold up the screen。 open the window and door Articles for preparing the solution: large and smaller measuring cups, warm and cool water, water temperature gauge, gauze, 1 2%soap solution or NS Folding screen, evacution container Immerse the anal tube in the antiseptic solution Hang enema bucket on the infusion holder (4060cm to the anal)。 lubricate the anal tube Vent air from the tube。 expose the anal。 insert the tube 710cm into the anal Hold the anal in one hand and the other open the clamp Require the patient to take deep breath Finish enema。 clip on the clamp。 take down the enema bucket Get some bumf。 pull out the ananl tube Place the tray on the table and the evacuation container on the chair Check。 interpret。 close the window and door。 unfold the screen Assist the patient to lie on the left side with the hip along the bed edge Pull the trousers down to the buttock。 bespread the rubber sheet and napkin 25 Intravenous Phlebotomizing Injection tray, syringe, hypodermic needle, tourniquet, bolster, blood container Take articles to bed Prepare to draw。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。