人教版高中必修一语法知识点总结内容摘要:

是一般疑问句,变为间接引语时,谓语动词是 say或 said时,要改为 ask或 asked,原问句变成由连词 if(或 whether)引导的宾语从句。 没有间接宾语的,可以根据情况加上。 例如 : “Do you think a diary can bee you friend?” the writer says. The writer asks us if we think a diary can bee our friend. He said,” Are you interested in English?” He asked if I was interested in English. 2) 特殊疑问句:直接引语如果是特殊疑问句,变为间接引语时,任然用原来的疑问词引导。 例如: “What do you want?” he asked me. He asked me what I waned. “When did you go to bed last night?” father said to Anne. Father asked Anne when she went to bed last light. Unit 2 English around the world (English language and its development, different kinds of English) Main grammar point: direct speech and indirect speech (requests and mands) 主要语法知识点: 直接引语和间接引语 语法知识点详解见 Unit 1. Unite 3 Travel journal ( travelling, describing a journey ) Main grammar point: the present continuous tense: expressing futurity 主要语法知识点:将来时 将来动作的表达法( be + ving) 初中课本介绍了 be going to 和 will( shall) +动词的形式表示将来的意义,现在进行时有时用来表示按计划或安排即将发生的动作。 如: Are you going to Mexico next week? Are you ing to the cinema? He is leaving for London in two hours. Unit 4 Earthquake (basic knowledge about earthquakes. how to protect oneself and others in disaster。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。