生态建筑论文中英文对照国外著名建筑师的生态建筑思想比较内容摘要:
is the construction of resource use in ecological building to be rapidly improving link.In recent years, the emergence of ecological building materials ③ alleviatethis problem. First of all the main characteristics of saving resources and energy, followed by reducing environmental pollution, and finally the easyrecovery and recycling.Above discussion, a certain understanding of the ecological , in order to further study the ecological building, is not enough torely on theoretical explanations, we need to analyze some examples, theory and practice, scientific research and understanding of ecological through the analysis and parison of ecobuilding ideas and works of two masters (Thomas Herzog and Norman Foster), to further understanding and study of ecological architecture, and learn from themaster of thought and practice nutrition, explore the development and prospects of ecological construction in China. 3. Thomas HerzogThomas Herzog is a perfect bination of technology and the arts, have a deep sense of mission at the same time on the ecology and environment of the German masters of architecture. His architectural works have a high level of technology, the essential meaning of his work lies in its ecological concern, not only in his design, in the course of teaching, often exhibitions, a large number of works, in cooperation with other architects, he goes beyond the paradigm of modern architecture, and replaced with more ecodumpingValue orientation, and this orientation is bound to replace the old paradigm. Thomas Herzog, ecological building thought Thomas Herzog rarely impose their own creative aspirations on the environment above, but to speculate and listen to the change process and the cycle of the ecological environment, the spirit of participation and cooperation to plete his work. His ecological building human and artificial matter to a natural and manmade natural cordial and harmonious situation. He always adhere to the principle of from ecology to architecture, from technology to nature, he has eco sublimated into a mental and spiritual, and throughout his life, the building design process.Thomas Herzog39。 s design is not considered an isolated internal and external form, on the contrary, his designs expanded to all aspects of the built environment and the relationship between the shape. In addition, he attaches great importance to work closely with other professionals to give greater freedom of architectural design activities through the development of new materials, new ponents, the new system and appropriate design tools, and ultimately to achieve the unity of the building and the natural environment coordination, as well as building its own sustainable development. Thomas Herzog in the architectural activities in addition to transportIn a variety of new materials, new ponents, the new system, has been updated in the research and development, more ecological, more reasonable materials, ponents and systems. Such as: Peituo Kaposi external wall system, Fischer facade assembly system, solar grid system, and so on. Thomas Herzog is more concerned about the accuracy and efficiency of the buildings in harmony with their surroundings on the basis of their own energysaving technologyThomas Herzog rarely own creative desire to impose. Architectural detail through carefully designed to improve resource and energy use efficiency, and reduce the cost of nonrenewable resources to focus on the ecological environment.Thomas believes that architects should take advantage of the technology, because of high efficiency by using much less material than conventional practice materials to meet the same functional requirements. Of course, the introduction of new technology, they must be correct and proper. He also is very concerned about the flexibility of the design flexibility and architectural elements, not only emphasizes the flexibility of the building function, but also stressed that the flexibility and versatil。生态建筑论文中英文对照国外著名建筑师的生态建筑思想比较
相关推荐
外排 依靠路边坡排向厂区主干道雨水管。 ( 6)管道埋深 ① 压力管道 在车行道之下,埋深 ~ ,不得不小于 ,在其他位置 ~,不宜大于。 ② 重力管道 由设计计算决定,但不宜小于 (车行道下)和 (一般市区)。 平面布置特点:布置紧凑,构(建)筑物占地面积比例大。 重点突出,运行及安全重点区域 UASB放于站前部,引起注意,但未靠近厂区主干道。 美化环境,集水井、调节池侧面
2) 物证搜集 现场物证包括、碎片、残留物及致害物的位置等。 在现场搜集到的所有物件均应贴上标签,注明地点、时间、管理者。 所有物件应保持原样,不准冲洗擦拭。 对健康有危害的物品,应采取不损坏原始证据的安全防护措施。 3) 事故事实材料的搜集 与事故鉴别、记录有关的材料包括:发生事故的单位、地点、时间;受伤害者和肇事者的姓名、性别、年龄、文化程度、职业、技术等级、工龄、本工种工龄、支付工资的形式
......................................................... 82 环境应急准备和响应控制程序 ......................................................................................................................... 86
的部分,各民族自治地方的自治机关都必须服从中央的领导。 我国实行民族区域自治,是尊重历史、合乎国情、顺应民心的必然选择。 第一,从历史传统来说,统一多民族国家的长期存在,是实行民族区域自治的历史渊源。 第二,从民族关系来说,在中华民族多元一体格局中,各民族之间密切而广泛的联系,是实行民族区域自治的经济文化基础。 第三,从民族分布来说,我国各民族的大杂居、小聚居的状况,以及自然、经济