[建筑土木]mc-ccs01a麦克维尔集中监控系统用户手册内容摘要:

der 30 状态图标 模式设置 制冷模式 制热模式 除湿模式 通风模式 风速设置 自动 高速 中速 低速 辅助设置 锁定 睡眠 辅助加热 摆风 温度 调节 内机 开关 降低设定温度 提高设定温度 点击关机 点击开机 麦克维尔智能监控系统 McQuay Smart Commander 31 Content 1. Description ..................................................................33 Wiring Connection Installation ..........................................33 Wiring Connection...............................................33 Wiring of munication specification ..................33 Electrical wiring connection..................................34 Switch setting .....................................................34 3. System Installation .......................................................35 Requirements for Hardware and System .................35 Procedure ...........................................................36 User Login:........................................................38 4. Basic Concepts:..........................................................39 Single Control, Multiple Control and Group Control 39 Timing, Mode and Task ...............................42 System Monitor and Indoor Monitor ......................42 Customized Group and Name................................43 5. Function Operation .......................................................45 Menu Introduction ...............................................45 Control of One or More Indoor Units .....................46 Customized Group Setting ....................................47 Timing Mode Editing ...........................................49 Timing Mode Setting ...........................................53 Edit of Customized Group Name and Indoor Unit Name ......................................................................54 Setting ................................................55 Management................................................57 for Fault Records and Realtime Fault........58 Manager Owner .................................................59 麦克维尔智能监控系统 McQuay Smart Commander 32 Static indoor Unit status ......................................60 Indoor Unit Information Query ............................61 6. Icon Description...........................................................62 Model Icon .........................................................62 Status Icon ..........................................................62 麦克维尔智能监控系统 McQuay Smart Commander 33 1. Description Update Record Version: As shown in the system help Wiring Connection Installation Wiring Connection Fig 1 Wiring of munication specification As shown as below: A: conducting wiring( copper, intersection surface is more than or 20AWG) Tr an sfo rm e r(D C 9 V)C om p ute rC om mu ni ca tio n W ire (C o nn ec t ou tdo or)C OM ca bleA2B1A1 B2M C_5 01R S232USBP OW E R S UPP LYP O W ERFXDRXDmainboard of outdoor unitBinNO:0 NO:31mainboard of outdoor unitAin ApcBin Bpc Ain BpcApcE N C R PT U SB KE YNO:30mainboard of outdoor unitAin Bin Apc BpcWi rin g cable麦克维尔智能监控系统 McQuay Smart Commander 34 B: Insulation material C: Screen layer(efficiency shall be higher than 95%) D: outside layer protector(PVC) Note: For wiring cable, refer to UL2547 and UL2791 standard。 Electrical wiring connection Digital scroll product electrical circuit have strong power circuit and weak power circuit。 Power of indoor and outdoor units must be supplied simultaneously。 Cable of power and cable of munication shall be designed in parallel, and maintain more than 20cm between the two cables。 Cable of munication shall be screened, to avoid the interference of strong signal。 Total length of signal wires should be less than 1000m。 Signal wires has 2 poles of A and B, the same pole must be in one connection (A can not be connected with B)。 Screened layer of signal wires should be connected with master unit until it be earthed。 Wiring diagram is shown in units。 Switch setting User can set the outdoor address code by setting the switch on the PCB board of outdoor unit. the S2 switch of MDS080500B code as following: Code Code 0 0 0 0 0 0 7 0 0 1 1 1 1 0 0 0 0 1 8 0 1 0 0 0 2 0 0 0 1 0 9 0 1 0 0 1 3 0 0 0 1 1 10 0 1 0 1 0 4 0 0 1 0 0 11 0 1 0 1 1 5 0 0 1 0 1 12 0 1 1 0 0 6 0 0 1 1 0 13 0 1 1 0 1 麦克维尔智能监控系统 McQuay Smart Commander 35 Code Code 14 0 1 1 1 0 23 1 0 1 1 1 15 0 1 1 1 1 24 1 1 0 0 0 16 1 0 0 0 0 25 1 1 0 0 1 17 1 0 0 0 1 26 1 1 0 1 0 18 1 0 0 1 0 27 1 1 0 1 1 19 1 0 0 1 1 28 1 1 1 0 0 20 1 0 1 0 0 29 1 1 1 0 1 21 1 0 1 0 1 30 1 1 1 1 0 22 1 0 1 1 0 31 1 1 1 1 1 the J2 switch of MDS030070 /080100ARcode as following: Code 5 4 3 2 1 Code 5 4 3 2 1 0 0 0 0 0 0 16 1 0 0 0 0 1 0 0 0 0 1 17 1 0 0 0 1 2 0 0 0 1 0 18 1 0 0 1 0 3 0 0 0 1 1 19 1 0 0 1 1 4 0 0 1 0 0 20 1 0 1 0 0 5 0 0 1 0 1 21 1 0 1 0 1 6 0 0 1 1 0 22 1 0 1 1 0 7 0 0 1 1 1 23 1 0 1 1 1 8 0 1 0 0 0 24 1 1 0 0 0 9 0 1 0 0 1 25 1 1 0 0 1 10 0 1 0 1 0 26 1 1 0 1 0 11 0 1 0 1 1 27 1 1 0 1 1 12 0 1 1 0 0 28 1 1 1 0 0 13 0 1 1 0 1 29 1 1 1 0 1 14 0 1 1 1 0 30 1 1 1 1 0 15 0 1 1 1 1 31 1 1 1 1 1 The S3 amp。 S4 of MDSC ARcode as following: Code S3 S4 Code S3 S4 Code S3 S4 Code S3 S4 0 0 1 8 0 8 16 1 6 24 2 4 1 0 2 9 0 9 17 1 7 25 2 5 2 0 3 10 1 0 18 1 8 26 2 6 3 0 4 11 1 1 19 1 9 27 2 7 4 0 5 12 1 2 20 2 0 28 2 8 5 0 6 13 1 3 21 2 1 29 2 9 6 0 7 14 1 4 22 2 2 30 3 0 7 0 8 15 1 5 23 2 3 31 3 1 NOTICE: only set master unit of the outdoor address code. 3. System Installation。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。