一般
t watch watched visit visited stay stayed Live lived shop shopped trip tripped study studied drink drank read read bringbrought buy bought see saw have had take took Pair work A: What did you do last
ll→ called[k: ld], play→ played[pleid]。 在 [t]和 [d]音后面发 [id]。 如:want→ wanted[wntid], need→ needed[ni:did]. 一般过去时态常见的基本用法 • 的状态 Liu Jie got up at 7: 10 this morning. He was a student three years ago.
5+285= 660(套) 一个服装厂计划做 660套衣服,已经做了 5天,平均每天做 75套。 剩下的要 3天做完,平均每天要做多少套。 计划做 660套 计划做 660套 前 5天做好的 每天做 75套 ① ② ③ 前 5天做好的 计划做 660套 每天做 75套 每天做。 套 后 3天要做的 平均每天要做多少套 247。 3天 3天要做多少套 计划做 660套 已经做了多少套 -
t with, eat lunch, like, get up, play puter games, have lessons, study • … 句型三:”非三单现在时“的否定句 • 主语 +don’t(do not)+谓语动词原形 +其他 • 数数“一些人”的缺点: • Some of us don’t ________. • clean the classroom , study
ever before these days in the past ten yesrs... Right or wrong? for last year since one day for ten days ago Since he es here. since in 1990 since last year for one day since ten days ago Since he
一般过去时的时间状语。 Great changes have taken place in my hometown in the past few years. (过去几年来,我的家乡发生了很大的变化。 ) Where did you work in the past? ( 你过去在哪里工作。 ) 上一页 下一页 主菜单 ★ 五、 even since then与 from then on
needed counted 写出下列动词的过去式 get is live sent drive run ask push say hurry try use work stop jump meet read see travel carry got was lived sent drove ran asked pushed Said hurried tried used worked
证、许可证 /批文 (比如: 3C 国 家强制认证、环保证书、进口配额等都不需要 )。 ( 2)费用特低。 根据国家进出境快件监管办法等法规规定,快件进出境可以享有一定的税费减免优惠。 再加上深圳靠近香港这 个国际自由港的地缘优势,操作方便,税率低,运作费用低,成本自然就更低。 ( 3)速度特快。 一方面,由于上述的监管条件少、手续简单等原因,简化了手续,自然也就节省了时间;另一方面,通关过程
模架 → 梁板支模 梁板浇筑砼 → 进入上层结构施工 第四节 各分部分项工程与主体结构施工的协调 一、砌筑工程 开始施工的时间确定为第三层浇筑完毕之后; 所有粗装修工作均在砌体施工完毕后隔层展开; 基本次序 (1)隔墙砌体( 2)门窗、框安装( 3)天面抹灰( 4)墙面抹灰( 5)楼面找平( 6)室内小型砌体( 7)洞口修补( 8)门窗扇安装 二、室内装修 室内装修分两个部分 ,一是粗装修
务紧锣密鼓铺开、雷厉风行推进,不折不扣完成。 县委、县政府高度重视这项改革,已开展了一系列前期工作。 去年 11 月,专门成立以 ***同志为组长的县建制村合并工作领导小组,组织调研组 深入各乡镇开展了合村调研,多次听取情况汇报,明确了原则方向,并经多次会商、反复细化,完善了工作方案及相关政策文件;县政府常务会议、县委常委会议对建制村合并工作方案及配套政策进行了专题研究