托福
碍的,所以大家在考的时候一定要注意要有耐心虽然死机后重启动可以接着考,但事实上这也是对你体力和忍耐力的摧残。 有时传得比较慢,但并不意味着死机了,只要多花点时间就可以听到题目的。 就考试的内容来讲,难度系数和老 TOEFL 的 part B part C 差不多,而且语速不觉得快,但是有国际口音,因为是课堂重现,所以有上课提问时,学生回答,有一个日本男生说得英语听起来就很不清楚。 同学们准备新
is person would like and dislike about living in your town or city? Why? Use specific reasons and details to develop your essay. A friend of mine from college is moving to my city, so I have been
in a big city has a superior overall living standard to that in a small town. There are more modities and services in city markets。 there are more public utilities available in big cities。 there are
t in our ways of success. Were we not to dare to challenge the criticisms of others, we could sometimes be smothered in the trend of mainstream, never achieving any truth, ., the real secret of
己的身体,腿,恐龙可以成长为一个非常大的规模。 大型恐龙优势,所以我们不需要恒温想法和运行解释为什么恐龙进化而来的,要根据自己的身体自己的腿。 好了,所以许多恐龙骨骼有关的骨骼结构有哈弗运河,这是真的。 恐龙骨骼也有年轮。 年轮增厚骨,表示时间时,恐龙并没有快速增长的时期。 这些年轮证据,恐龙停止生长或生长在较冷的时期更慢。 你知道,这种周期性的增长模式,快速增长其次是没有增长或增长缓慢
erature increase has occurred during the winter and spring, not during the summer. Butthe increase in shrubs has occurred in the how can increase temperaturesin thewinter and spring result in
ion. The lecturer goes on to refute the claim in the reading that fossil trading business prevents scientists and public museums from benefiting from fossil finds, as these parties cannot pete with
conscious or intentional recollection, usually of facts, names, events, or other things that a person can state or declare. There is another kind of memory that is not conscious. Memories of this
c congestion. On one hand, it saves us time, on the other hand it’ll make it easier for us to make plans and schedules. In contrast, other vehicles running on the roads and streets are extremely
B as my inclination. My arguments for this point are listed as follows. I agree with the statement that _________without reservation since___________. Naturally___________. It can be given a concrete