胡村小学李兰亭小四英语上册教案14内容摘要:

boys on the bike. Step Two: Task prensentation Where is Daming? What is he doing?大明正在给大家介绍手抄报的内容。 学完课文后我们也要选出班级手抄报的图片,谁的图片将入选呢。 Step Three: Text learning.(about 15min) 1. listen and think. What are in Daming’s photos? 2. Look at pictures and think how to intruduce them. 3. Listen and point 4. Group work: try to answer the question “What are in Daming’s photos?” 5. T Guide the student to answer the。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。