八上过关练习unit7willpeoplehaverobots第一课时sectiona(1a-2c)内容摘要:

serious. robotstrees everythingpaper Pollution 二、单项选择。 (5 4分= 20分 ) 6. This lake is so dirty, so ____ people go to swim in it. A. a little B. a few C. little D. few 7. It ____, so don39。 t need to take an umbrella. A. will rain B. won39。 t rain C. rains D. rain 8. If there are ____ people driving, there will be ________ air pollution. A. less; less B. less; fewer C. fewer; fewer D. fewer; less 9. Kate needs three ____. A. papers B. pieces of papers C. pieces of paper D. piece of papers 10. — Will there be more robots in the future? — ____. A. Yes, there won39。 t B. No, t。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。