4539 CMOS 双四路数据选择器-多路开关内容摘要:

00520068is in a of of is by . A“on to in toof nto n dc 8 (0.5 DC 0.5 DC 1050065 1508260to P ” 7.0 0095C 5o 125L” 12 0095C 00o 125 X X X X 1 00 0 X X X 0 0 00 0 X X X 1 0 10 1 X X 0 X 0 00 1 X X 1 X 0 11 0 X 0 X X 0 01 0 X 1 X X 0 11 1 0 X X X 0 01 1 1 X X X 0 1X = t 19951/9420 55 25C 48D 510655525 0” ” 0 0” O= 4.5 (9.0 (13.5 ” O= 0.5 (1.0 (1.5 0) 150300600(50 pF on (A/f + (A/f + (A/f + is to be is as an of Cs *5To at 0 T(= 0 + (50) A ( V = (in f in is k = to to or be to of to be to ( be to an。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。