外研版高中英语必修3module3theviolenceofnature之四内容摘要:
e than700 people_ _________________(die/kill) and 2,700 people______________(injure) • the hurricane ,mary_____ (see) that the roof of the house_____________(disappear). • ________(return) home ,and _____(find) all the • furniture ____________(ruin) by the flood. • _____(leave) the house,when the thunderstorm ___________(finish) • she _________(weak up ),she_____(find) that her house ________________(destroy) by the thundersdorm. • was unhappy because some of his animals_____________________(kill/die). had died/had been killed had been injured had disappeared returned found had been ruined left had finished woke up found had been destroyed had been killed /had died saw Choose the words for transition(过渡词) to plete the sentences luckily unfortunately thankfully hopefully sadly fortunately • 1 _________________, they left the house before it collapsed. • 2 ___________________, many people lost their lives. • 3____________, many people showed their love to the survivors. • 4 _________, it won’t be long before everything returns to normal. Luckily/Fortunately Sadly/Unfortunately Thankfully Hopefully How can。外研版高中英语必修3module3theviolenceofnature之四
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。