外研版高中英语必修3module5greatpeopleandgreatinvention之一内容摘要:
ack归还;带回; (事物 )使记起 • bring in吸引;引进;赚得 • ① He left her to bring up their young children on her own. • 他留下她独自抚养他们年幼的孩子。 • ② His new suggestion was brought up at the meeting. • 他的新议案在会议上被提出来。 • ③ He was drunk and brought up what he had at midnight. • 他喝醉了,半夜里把吃的东西都吐了。 • ④ What brought about the change in his attitude? • 是什么使他改变了态度。 • ⑤ The photographs brought back many pleasant memories. • 那些照片给人带来很多美好的回忆。 • in conclusion总之;总而言之 • (1)reach/draw a conclusion得出结论;下结论 • e to/arrive at a conclusion得出结 • (2)conclude v.结束;下结论;推断 • conclude that= draw a conclusion that下结论 • to conclude总而言之,总之,最后 • ① In conclusion, I think the best way to make a friend is to be one. • 总之,我认为交朋友最好的办法是去做一个朋友。 • ② I will say, in conclusion, that it is an honour to be the speaker at this ,我要说我很荣幸能在这次会议上讲话。 • ③ We came to the conclusion that the room must have been empty. • 我们的结论是:那个房间当时一定是空的。 • ④ He thought it over carefully and concluded that heavy objects always fall faster than light 了结论,重的物体要比轻的物体下落得快。 • ⑤ Let me conclude my speech with a saying: where there is a will, there is a way.让我用一句谚语结束我的演讲:有志者,事竟成。 • 1. —Ann seems to be ’ s up? • —She________from the voice on the line that her mother is not satisfied with her test scores. • A. includes B. concludes • C. suggests D. contains • 【 解析 】 答句意为:她根据电话中的声音断定母亲对她的考试成绩不满意。 • 【 答案 】 B • 2. Young children should be________to be honest and equal. • A. brought up B. brought out • C. brought down D. brought in • 【 解析 】 bring up do教养 „„ 使之能 „„。 句意为:应该教导小孩子诚实和平等。 • 【 答案 】 A • 3. A great deal of science and technique has been________since China carried________reform and open policy. • A. brought down; on B. brought in;out • C. brought out; out D. brought up; on • 【 解析 】 动词短语辨析题。 carry on继续进行,进行下去; carry out实行,执行。 句意为 “ 自从中国实行改革开放以来,大量的科学技术被引进 ”。 “ 引进,吸收 ”应用 bring in。 • 【 答案 】 B • 4. The two countries have been________war________each other for more than five years. • A. at; for B. in; against • C. at; with D. in; with • 【 解析 】 be at war with...“ 与 „„ 交战 ” 是固定短语。 • 【 答案 】 C • 5. Wouldn’ t it be________wonderful world if all nations live in________peace with one another? • A. a; / B. the; / • C. a; the D. the; the • 【 解析 】 a wonderful world一个美好的世界, in peace和平地 (相处 )。 • 【 答案 】 A • 1. Treat others________ ________ ________you want to be ,勿施于人。 • 【 答案 】 in the way • 2. Ancient China was________ ________ ________states were often________ ________ ________each other. • 古代中国是一个国与国之间经常发生战争的地方。 • 【 答案 】 a place where; at war with • 3. Mencius believed that________ ________ ________man is different from animals________ ________ man is good. • 孟子认为人不同于动物的原因是人性善。 • 【 答案 】 the reason why; is that • 4. ________ ________ ________you need to be a bit mad to be an 想成为发明家,得需要一点疯狂和着迷。 • 【 答案 】 They say that • Mencius believed that the reason why man is different from animals is that man is good. • 孟子认为人不同于动物的原因是人性善。 • (1)believe后是 that引导的宾语从句,从句中使用 the reason why...is that...句式,其中 why引导的是定语从句, that引导的是表语从句。 • (2)。外研版高中英语必修3module5greatpeopleandgreatinvention之一
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。