外研版高中英语必修4module1lifeinthefuture之二内容摘要:

两项;再根据句意 “ 赖斯说美国政府高度重视发展与中国的建设性合作伙伴关系 ” ,可知赖斯所说的内容是客观事实,故排除B而选 A。 • 【 答案 】 A • 4. The general manded that the soldiers ________ unless he ________ the mand. • A. don’ t attack; give • B. didn’ t attack; will gave • C. should not attack; would give • D. not attack; gave • 【 解析 】 mand 作动词时,其后的宾语从句中谓语用 (should)+ do,可排除A、 B两项。 unless 引导的条件状语从句中,用一般过去时代替过去将来时,故选 D。 • 【 答案 】 D • 5. As far as I know, he is ________ because of stealing money. • A. in arrest B. under arrest • C. at arrest D. for arrest • 【 解析 】 be under arrest“ 被拘留 ” 是习惯搭配。 • 【 答案 】 B • 6. If he wants to get to Beijing by tonight he has no alternative but ________ by air. • A. go B. to go • C. going D. gone • 【 解析 】 have no alternative but to do“ 除 „„ 之外别无选择 ” 是习惯搭配。 • 【 答案 】 B • 7. The car speed on this part of the road is limited________60 km an hour. • A. at B. for • C. in D. to • 【 解析 】 句意为 “ 在这一段路上车速要限制在每小时 60英里 ”。 • 【 答案 】 D • 1. (某物 )用完;没有了;不多了 • 2. 依靠 • 3. 订购 • 4. 用完 • 5. 即将被淘汰;即将过时 run_out rely_on place_orders use_up on_the_way_out • 6. 肯定地 • 7. 除掉;处理掉 • 8. 免费 • 9. 小心;当心 • 10. 首先 for_sure get_rid_of free_of_charge look_out for_a_start • run out of用完 „„ • (1)run out of意为 “ 用完了 ” ,是及物短语,表示主动意义,主语一般是人。 • (2)run out意为 “ „„ 用完了 ” ,是不及物短语,其主语通常为时间、食物、金钱等名词。 • (3)give out用尽,精疲力竭,为不及物短语。 • (4)use up用完,消耗尽,为及物短语。 • ① The car ran out of petrol after ten miles. • 这辆小汽车跑了 10英里就没油了。 • ② We are running out of our time.= Our time is running out. • 我们剩下的时间不多了。 • ③ His strength gave out after he ran that long distance. • 跑完这么长一段距离,他已精疲力竭。 • ④ My money has been used up, so I have to return home. • 我的钱已经用完了,因此我必须回家。 • rely on/upon依赖;依靠;信任;信赖 • (2)rely on (doing) ,信任 • (3)rely on it that...相信 „„ ,指望 „ „ • ① Don’ t rely on my seeing you 指望我为你送行。 • ② I rely on her to pay back the money. • = I rely on her paying back the money. • 我相信她会还钱。 • ③ You may rely on it that he will e to meet you . • 你放心好了,他会来接你的。 • get rid of= rid...of摆脱,丢掉;除去,赶走 • (1)get down to(doing)sth. 着手 (开始认真 )做 „„ • (2)get along/on with sb. 与某人合得来;与某人和睦相处 • (3)get into 陷入 • (4)get over 从 (疾病、失望等中 )恢复;克服 (困难 ),解决 (问题等 ) • (5)get through (with) 干完 (工作 ),完成任务;度过 (时间 );通过;打通电话 • ① I’ ve tried all sorts of medicines to get rid of this cold. • 为了治好感冒,我已经试用了各种药物。 • ② The young man made up his mind to get rid of his bad habit. • 这个年轻人决心改掉坏习惯。 • ③ You must get rid of all your worries and have a good rest. • 你必须排除所有的担心,好好休息一下。 • ④ He just sat there talking all evening and I could not get rid of 着谈了整整一个晚上,我不能把他赶走。 • ⑤ I’ m afraid your daughter failed to get through her midterm 有通过期中考试。 • 1. (2020年江苏卷 )—I’ m still working on my project. • —Oh, you’ ll miss the is________. • A. running out B. going out • C. giving out D. losing out • 【 解析 】 句意为: ——我仍然在做这一个项目。 ——啊。 你也许不能如期完成了。 因为快没时间了。 当表示时间用完、耗尽的时候多用 run out。 give out分发,精疲力竭。 • 【 答案 】 A • 2. The photographer needs to charge up the digital camera every day as the battery________quickly. • A. shuts up B. ends up • C. runs out D. tur。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。