语文版中职英语基础模块上册unit10sports2内容摘要:

It’s about 26 miles. • 3. When Pheidippides got to the city of Athens, what happened to him? He shouted, “Good news! We have won!” Then, he fell down and died. The Second Paragraph • With great joy 欣喜若狂 with 表原因,理由 Red with anger 愤怒的涨红了脸 Be good at doing sth 擅长做某事 她擅长唱歌 She is good at singing.。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。