中考英语七年级上全程知识点总结及练习(含答案)内容摘要:
A. my B. I C. mine D. me 3. Oh, your kite is very nice. __________________. A. That’s right B. No, it’s not nice C. Yes, it is D. Thank you 4. The woman is sixty, but she _______ young. A. is B. sees C. looks D. watches 5. It’s time ________ lunch. Let’s go home. A. to B. in C. for D. on 6. ________ is your coat? The black one. A. What B. Where C. Which D. How 7. ________ is the toy? It’s on the bed. A. Who B. Where C. What D. Whose 8. The shoes are too old. Put ________ over there. A. it B. they C. their D. them 9. Excuse me. Can you _______ my watch, please? A. look B. look like C. look after D. look at 10. Look _______ the blackboard and listen _______ the teacher. A. / / B. at。 to C. after。 / D. on。 after 11. Whose dress is this? It’s _________. A. Lucy B. Lucy’s C. Jim D. Jim’s 12. The girl ______ the purple coat is his sister. A. at B. in C. on D. with 13. There is a bird ______ the tree. A. in B. on C. to D. of 14. There are many ________ in our school. A. woman teachers B. woman teacher C. women teacher D. women teachers 15. Is there a ball under the desk? ______________________. A. Yes, it is B. Yes, there’s C. No, there isn’t D. No, there is 16. There _______ some books and a pencil on the desk. A. am B. is C. are D. be 17. Let me help you. _______________. A. You’re wele B. Thanks very much C. Don’t worry D. Yes, thanks 18. ______ old man is ______ English teacher. A. The。 an B. An。 an C. The。 the D. A。 a 19. What _____ five plus six? It’s eleven. A. am B. is C. are D. / 20. What ______ you see in the picture? I can see some flowers. A. must B. can C. are D. do 二 . 完形填空 This is a picture of Kat’s ____1____. What can we ____2_____ in the picture? Look ____3____ it, please. The man ____4____ the black coat is Kate’s father, Mr. Green. The ____5____ in the red sweater is Mrs. Green. They ____6____ young. The baby is Kate. The little boy is Kate’s ____7_____, Jim. ___8____ the man behind Mrs. Green? Oh, he’s ____9___ brother, Mr. Read. He ____10____ young, too. 1. A. families B. family C. parents D. brothers 2. A. look B. do C. see 3. A. at B. after C. for D. up 4. A. on B. of C. in D. to 5. A. man B. girl C. women D. woman 6. A. are B. is C. look like D. looking 7. A. sister B. brother C. father D. aunt 8. A. What’s B. Where’s C. Who’s D. How is 9. A. his B. her C. our。中考英语七年级上全程知识点总结及练习(含答案)
本资源仅提供20页预览,下载后可查看全文
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。
相关推荐
西师大版一年级上册分一分之二
方法有很多,我们可以按颜色分,黄色是一组,红色是一组;还可以按种类分,汽车是一组,布娃娃是一组 把图中是学习用品的圈出来 这三项是学习用品,可以归为一
中考英语名词考向分析与考点训练
1. The tiger39。 s______(tooth) are bigger than the monkey39。 s. 2. There are two new ______ (shelf) in my study. 3. Jim and Mike are good friends of _______(I). 4. Many ______(foreign) have visited
中考英语模拟试卷及参考答案
shall I do ? she said. Then a policeman came and said to her kindly (和蔼地 ). Good morning, Madam. Don39。 t you like any of our colours today? ( ) 51. Mrs Green’s grandchildren didn’t want her to drive