高一英语culturalrelics(苏教版)内容摘要:
amber, but also some other materials. 4 The Russians did not care about the Amber Room at all, so it was stolen by the Nazis. 5 The Russians have rebuilt a new Amber Room at the summer palace. F F T F F Fill the blanks with proper words or numbers. The Amber Room Amber feels as as stone, but it easily when heated, and can be made into any . The Amber Room, one of the great wonders of the world, was made for the palace of Frederick Ⅰ ,the king of Prussia. It was about meters。高一英语culturalrelics(苏教版)
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。