科技英语文档翻译内容摘要:
things. The result is cleaner, less cluttered drawings. Another example of a productivity enhancement for drafting might involve automating auxiliary views of a design. By pressing the right button or by entering the right mand, a drawing could be turned 90 degrees in one direction or another. Threedimensional designs could be rotated on any axis or displayed in any of several projections. To take it one step further, remember that entire designs can be stored on the system. When the drafter receives a job that has specifications similar to a stored drawing, he merely retrieves it, brings it into working storage, and edits those portions of the design that are not consistent with the specifications of the new job. Productivity increases are thus pounded. The original job is speeded up, and that job, in turn, is used to speed up the next job even further. This illustrates the need to maintain a plete and uptodate data base that can be accessed easily by all users. IMPROVING DESIGN ANALYSIS Design analysis is another important task that can be handled automatically by a properly integrate CAD/CAM system. This is particularly important in an application like piping plant design where drawings are often plex and must adhere to precise industry specifications. A CAD/CAM system with piping design applications software can give the user automatic feedback on such characteristics as fluid capacities, material chemistry, stress limitations, and coupling requirements. It can also generate orthographic plans, elevation data, equipment parts lists, cost estimates, flow diagrams, process and instrumentation diagrams, and bills of materials. The system can even access and control plex engineering analysis programs and provide instant feedback on the viability of various design alternatives. OTHER ANALYTICAL BENEFITS CAD/CAM can influence a pany’s engineering systems in many other ways as well. It can streamline all physical processes, and permit reevaluation of current engineering methods and reporting procedures. CAD/CAM improves and expedites quality assurance techniques, and it lends itself naturally to maintaining accurate and plete documentation and to keeping accurate records of part numbers and bills of materials. WHAT ARE THE DRAWBACKS?。科技英语文档翻译
相关推荐
三 章 : 应急措施 第 九 条:火灾事故的应急过程主要以扑救火灾、医疗救治、抢救贵重设备等为主要任务。 第 十 条:在消防安全事故突发时能及时有效地进行应急处置,全 公司 所有人员在保证自身安全的情况下,服从专人指挥最大限度地保证 职工 人身安全和 公司 财产安全,按照“救人第一和快速有效”的处理事故原则,及时灭火、抢险、消除险 情、控制事态发展,将事故损失降低到最小程度。 第 十一 条:全
一秒钟,然后将吸嘴提离液面。 用药用吸纸抹去吸嘴外面可能附着的液滴。 小心勿触及吸嘴口。 放液 将吸嘴贴到容器内壁并保持 100— 400 倾斜。 平稳地把按钮压到第一停点。 等一秒钟后把按钮压到第二停点以排出剩余液体。 压住按钮,同时提起加样器,使吸嘴贴容器壁擦过。 松开按钮。 按吸嘴弹射器除去吸嘴。 (只有改用不同液体时才需更换吸嘴。 ) 注意事项 流式实验室应备有 2 套连续可调式加样器
糊 匹配模式,最后单击检索命令。 1 ( 5)检索结果如下图: 共有 407 条记录。 ( 6) 、改变检索策略,将模糊匹配模式改为精确匹配模式。 结果如下图: 2 3 EBSCO 数据库进行外文检索 具体步骤如下: ( 1)、进入检索界面 ,将语言改为简体中文,点击全选 ( 2)、单击 ,进入检索界面。 ( 3) 、 单击高级检索,进入如下界面。 ( 4)、输入检索词 Application
使用,甚至可导致生命危险。 二、秋季常见的呼吸道传染病 秋季常见的呼吸道传染病有流感、军团菌病、肺结核等。 这类传染病经呼吸道传播,是“吸进去”的传染病。 细菌或病毒可直接通过空气传播,或通过灰尘中细菌或病毒的飞沫核经呼吸道进入人体后发病。 呼吸道传染病预防措施: 保持室内经常通风换气,保持空气清新;讲究个人卫生,不随地吐痰,日用品常进行日照消 毒和适当处理;有呼吸道传染病流行时
代表有限合伙人实际出资额 30%以上的有限合伙人提议,可召开临时会议。 第二十九条 合伙人按照合伙人会议的有关规定对合伙企业有关事项作出决议,合伙人会议由全体合伙人按照表决时各自实缴出资比例行使表决权,合伙人会议作出决议必须经代表过半数表决权的合伙人通过,但法律另有规定或本协议另有约定的除外。 第三十条 合伙企业事项的处理方式 合伙人会议由全体合伙人组成,是 本合伙企业的最高权力机构。