特变电工国际成套工程承包有限公司20xx资质中英文内容摘要:

ss than 5 times of registered capital, Power project with single capacity of 100000KW。 Power project of 110kV transmission and transformation circuit as well as plete engineering with same voltage. 8. 独山子入网证 Dushanzi Market Access CNPC Dushanzi Petrochemical Company Market Access Certificate No: DSZSH20200352 1) Basic Information of the Company Enterprise Name: Xinjiang TBEA International Turnkey Project Construction Co. Ltd Nature: Limited Liability Company Address: No 1, Zuanshi City, High amp。 Newtech Development Zone, Urumqi, Xinjiang Juridical: Chen Weilin Registration: 50Million RMB Business Scope: Manufacturing and Sale of Distribution Panel and Switchgear。 Maintenance and recall of Transformer。 Sale of electromechanical products, export and import of goods and technology。 Installation, Maintenance and Commissioning of Power transmission and transformation project of 110 kV and below. Sale of transformer and its accessory, cable, wire, hardware amp。 electric material, chemical product, and construction material。 Processing and sale of metal material 2) Market Access Information Market Access Category: repairing, maintenance, construction Qualification Rank: A Access Range: The installation, repairing and adjusting of electricity transmission and transformation project of 110KV and below. Valid Period: July 1, 2020 June 30, 2020 9. 安全生产许可证 Work Safety Certificate Work Safety Certificate Enterprise Name: Xinjiang TBEA International Turnkey Project Construction Co. Ltd Juridical Principal: Chen Weilin Address: No 1, Zuanshi City, High amp。 Newtech Development Zone, Urumqi, Xinjiang, China Nature: Limited Liability Company Scope of Permission: Building Construction Valid Period: March 26th, 2020 to March 25th, 2020 10. 承装电力设施许可证 Electric Power Facilities Installation (Mending amp。 Debugging) Permit Electric Power Facilities Installation (Mending amp。 Debugging) Permit Issued by State Electricity Regulatory Commission Company Name: Xingjing TBEA International Turnkey Project Construction Co., Ltd Address: Zuanshi District, High amp。 New Tech Free Zone, Beijing Road, Urumqi, Xinjiang Legal Representative: Chen Weilin Type and Rank of Permit: C installation (mending amp。 debugging) Validity: July 6th, 2020 July 6th, 2020 Issuing authority sealed on Oct. 26th, 2020 11. 道路运输经营许可证 Road Transport Operators Permit Road Transport Operators Permit Enterprise Name: Xinjiang TBEA International Turnkey Project Construction Co. Ltd Address: No 1, Zuanshi City, High amp。 Newtech Development Zone, Urumqi, Xinjiang, China Scope: General Cargo Transport Valid Period: Nov 20th, 2020 to Nov 19th, 2020 12. 对外贸易经营者备案登记表 Foreign Trade Business Registration Form Foreign Trade Business Registration Form Serial Number: 00147430 Enterprise Code: 6503757662620 Enterprise Name Xinjiang TBEA International Turnkey Project Construction Co. Ltd Code of anization 757662620 Operator Type Other Limited Liability Corporation Address No 1, Zuanshi City, High amp。 Newtech Development Zone, Urumqi, XinJiang, China Phone 09913859934 Fax 09913859934 Postal Code 830011 Email Registration Date 2020130 Registration Number 650000039000376 Juridical Principal Chen Weilin ID No 652301195912133235 Registration 80Million RMB Sealed on April 7th, 2020 13. 质量管理体系认证证书 Certificate of a Quality Management System 14. 环境管理体系认证证书 Certificate of a Environmental Management System 15. 职业健康与安全管理体系认证证书 Certificate of an Occupational Health and Safety Management System 16. 近年工程业绩 Performance in Recent Years 序号 项目名称 工程规模 建设 迄止年限 承担的 工程内容 质量评 定等级 建设地点 1 苏丹 73km110kV 输变电成套工程 110kV 变电站及线路 20202020 总承包 优良 苏丹 2 苏丹 261km220kV 输变电成套工程项目 220kV 变电站及线路 20202020 总承包 优良 苏丹 3 青海送变电工程公司 110kV 变电所电气设备安装 变电所安装 优良 青海 4 甘肃兰州窑街劣质煤热电厂 225MW+ 1130t/h循环流化床锅炉 总承包 优良 兰州窑街镇 5 贵阳市南供电局 110kV 变电所安装工程 变电所安装 优良 贵阳市 6 云南江城 110kv 变电所 110kV 变电站安装 变电站安装、调试 优良 云南江城 7 云南怒江电网有限公司 110kV 变电所安装工程 变电所安装 优良 云南福贡县 8 塔吉克斯坦 500kV 杜尚别站三通一平项目 超高压 500 千伏变电站整站地基处理 地基强夯 优良 塔吉克斯坦克 9 塔吉克斯坦 220kV 哈德隆站三通一平项目 220 千伏变电站整站地基处理 地基强夯 优良 塔吉克斯坦克 10 塔吉克斯坦 220kV 库利亚布站三通一平项目 220 千伏变电站 整站地基处理 地基强夯 优良 塔吉克斯坦克 11 塔吉克斯坦国家电网改造工程设备运输 500kV 变电站及线路设备、 220kV 变电站及线路设备 国际运输 优良 中国 塔吉克斯坦 12 中油国际 ADM 公司阿雷斯油田项目 油田 35kV 变电站 总承包 优良 哈国 13 哈萨克斯坦 CUM油田 35 千伏变电站项目 35kV 变电站 总承包 优良 哈国 14 中油国际 ADM 公司转。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。