中南汇化工有限公司高栏港石化码头工程施工组织设计内容摘要:

ndar ds and national standar ds, bined wit h t he experience accumulated by t he pany engaged in m ult iple pr oj ects, pr epare t he t echnology package. If the cont ents or any other aspect of t he pr ogr am me has not det ailed wher e we wele your valuable ments. Second, t he design principles of the project design f ol ws t echnol gy advanced, funct ional, stable and cost saving pr inciples. And consider ing const ruct ion, maint enance and oper at ion, and f or f uture development , expansion, r econst ruct ion and ot her f act ors leave room f or expansion. Design elements of t he syst em is t he systemat ic, int egr at ed and prehensive。 design has t he scientif icit y, r easonabilt y and oper abilt y. I ts has f olowing pr inciples: 2. 1, and advanced and applicabilt y used cur ent ly most advanced of sof t, and hardwar e and t he work t echnol gy, err or s r ate low, patible sex str ong, upgrade easy, used module type st ruct ure, expansion convenient, no repeat const ruct ion investment, syst em of t echnol gy per formance and qualit y index should r eached inter national leading level。 while, syst em of installat ion debuging, and soft war e progr am ming and oper at ion using and should simple, easy m aster, for China condit ions and t his project of eat ures. Set t he num ber of advanced t echnology in a t he syst em s, r ef lect s t he cur r ent level of t he lat est developm ent of put er and wor k t echnology, adapt ed t o t he r equir em ent s of t he t im es. While t he syst em is t he syst em used f or var ious m anagem ent levels, it s f unct ions ar e conf igur ed t o pr ovide t he user wit h f or t able, saf e, f a st and convenient t o 3. 1, t he int elligent building design st andar ds ( GB/t 50314 2020) 3. 2, t he design st andar d f or int elligent building syst em s engineer ing ( DB32/191 1998) 3. 3, t he code f or engineer ing design of generic cabling syst em f or cit y residential buildings ( CECS/1192020) 3. 4, code f or design of buildings and campus cable syst ems engineering ( GB/T50312020) , t he code f or elect rical design of civil buildings ( J GJ / T1692) , t he code f or civil closed cir cuit m onit oring TV syst em engineer ing t echnology ( GB/5019894) 3. 7, the types of syst em ear thing and saf et y technical r equirements (GB14050 93) 3. 8, of t he secur ity engineering procedures and r equirements (GA/T7594) , t he r ules of secur it y engineering acceptance (GA/T308 2020) , t he indust rial design of TV system code (GBJ 115) 3. 11, t he Secur it y checks pr event ion syst em pass f or gr aphics ymbol ( GA/7494) , and f ir e linkage contr ol equipment Gener al t echnology condit ions ( GB 16806 1997) f our, and syst em f unction and features in system both advanced, and pr actical, and matur e, and r eliable, and do system open, and can extended sex god, both invest ment reasonable, and benefit s best of pur pose, bor der securit y alar m system on site equipm ent f or concent rated monit ored, and contr ol and management , makes t hese equipment to securit y, and r eliable, and efficient o r un, M axim ize int elligent management role t o cr eat e a safe, healthy, fort able and pleasant, and t o improve t he efficiency of a god envir onment and save energy, and r educe maint enance per sonnel. According to t he pr oj ect 39。 s environment al needs, and engagement f unctions to establish t he project boundar y secur ity alar m system, in a Word, t his boundary is a pr oj ect of t he securit y alarm syst em is highly automated and eff icient hospit alit y f or a fort able, convenient , and highly secure envir onment. Five, scheme design based on design pr inciples, design specif icat ions and accor ding t o international and omest ic standards, and in accor dance wit h user needs, as well as dr awings and r elat ed inf ormation provided by, and j oining the project 39。 s act ual sit uat ion and f uture development r ends, bor der securit y alar m systems for t he project design. . pr inciple of system and bur glar alarm syst em fr om detectors, r egional dir ect or s, and t he alarm contr ol centr e posed of t hr ee part s. It s pr inciples as in t he f ol wing chart : detect or s f or bur glar alar m syst em is inside and out side t he building in key ar eas, im por tant places, pr ot ection, when t he pr obe t o ilegal invaders, t he signal t r ansm it ted t o t he alarm contr ol: sound and light alarm, display addr ess, about he per son on dut y af ter r eceiving t he alarm, t ake m easur es according t o t he sit uation, t o cont r ol t he developm ent of t he sit uation. Ant it hef t alarm system alarm f unction in addit ion t o t he above, t her e is linkage f unction. Such as: open t he alarm light ( including inf r ar ed lam p), int er active audio and video m at rix cont r oler , swit ch on t he alarm cam era on t he spot, m atrix contr oler TV series of cont rol: m onit or displays an im age, video f oot age, m ult im edia contr oler aut om atic or hum an . . 8. 1 t he t hree guarantees period war ranty 1, warr ant y 1) ser vice period f rom dat e of accept ance of engineering, a 1 year warr ant y, war r anty pr ocessing is plet ed wit hin t he r esponse t ime is 48 hours. 2) ser vice wit hin t he war rant y per iod, we all accessories uncondit ional warr ant y f or all equipment and r eplacement , all par ts f or all equipment (including all m achine part s) maintenance and par ts are f ree and provide onsit e cleaning, test equipm ent services. Dur ing t he warranty period, all equipment r epair and m aint enance ser vices f or onsit e services, t he result ing fees ar e waived. Free for system expansion, upgr ader elat ed t echnical suppor t services. 3) syst em warr anty cont act inf ormat ion t o provide users wit h f ree t echnical advice, detailed answer t o any p。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。