工业安全卫生组织内容摘要:
gles should be worn at all times while working with chemicals at the counter or laboratory hood. A face shield should be worn when working with potentially eruptive substances. • Custodians, maintenance workers, and visitors must observe safety rules, including eye protection, while in the laboratory. • Wear protective gloves and clothing whenever handling corrosive or other hazardous chemicals. • Wear closedtoe shoes at all times in the lab. • Be sure that moving parts of mechanical apparatus are guarded to prevent hazardous contact. • Maintain your lab area reasonably neat and uncluttered. • Use the fume hood for all operations involving harmful gases or fumes and for flammable or explosive materials. Check the hood to see that it is operating adequately and has been inspected annually. PERSONAL PROTECTION, CLOTHING, AND HAIR 2 • Use a safety shield or barrier to protect against explosion, implosion, and flash fires when performing reactions with large volume of flammable liquids or unstable material. • Inspect glassware for cracks, sharp edges, and contamination before using. Broken or chipped glassware should be repaired and polished or discarded. • Always use a lubricant (., water, glycerol) when inserting glass tubing into rubber stoppers or grommets. Protect hands in case tubing breaks. • Broken glass should be put in impervious containers that are large enough to pletely contain the glass. These containers are to be placed into the building trash dumpsters by laboratory personnel, not by custodians. • Do not handle radioactive isotopes without concurrence of the Radiation Safety Officer. CHEMICAL HANDLING • Use a safety pail for transporting dangerous or flammable liquids of more than a small quantity (one pint). Use means to prevent tipping of containers when transporting materials on a cart. • Do not work with large quantities of reactants without special precautions. • Never pour anything back into a reagent bottle. • Use caution when adding anything to a strong acid, caustic, or oxidant. Add slowly. • Never add solids (boiling chips, charcoal, etc.) to a hot liquid. • Never pipet chemicals by mouth. Use a pipet。工业安全卫生组织
相关推荐
摸清班级情况的基础上,制定班主任工作计划与本学期班级奋斗目标。 要求计划可操作性强,措施得当,目标明确。 ( 2)做好开学的各项准备工作。 对上学期遗留问题和本学期可能发生的新问题做好预防,个人不能解决的,及时向有关部门汇报,力求使影响正常教学的问题在开学初得到解决。 ( 3)响应学校的号召,积极组织班级学生参加学校组织的各项活动,完成学校布置的各项任务。 ( 4)组织好月考
口稠密有大量勞動力 6. 工業發展悠久,有良好基建及技術勞工 7. 有外國投資而得的技術和資金 8. 本地需求大 ManufacturingChina 1949 – 78 :兩 個五年計劃 第一 個五年計劃 (19531957) 跟隨蘇維埃工業化模式 鋼鐵業是主要領導工業 改善現存的鋼鐵廠,如在鞍山、上海 工業遷入內地, 是為分散 化 向華北發展,以西安、蘭州為中心 向華中發展
H2SO4,H3PO4,HgSO4,分子筛,离子交换树脂 烷基化,异构化 H3PO4/硅藻土, AlCl3,BF3,SiO2Al2O3,沸石分子筛 按反应机理进行分类 酸碱型催化反应 酸碱型催化反应的反应机理可认为是催化剂与反应物分子之间通过电子对的授受而配位,或者发生强烈极化,形成离子型活性中间物种进行的催化反应。 氧化还原型催化反应
读作:“三次根号 a”, 其中 a叫 被开方数 , 3叫 根指数 , 3不能省略. 3 a归纳 探究 你能说说数的平方根与数的立方根有什么不同吗。 平方根 立方根 a 3 a定 义 个 数 表示方法 取值范围 如果一个数的平方等于 a,那么这个数就叫做 a的平方根 (也叫做二次方根 ). 如果一个数的立方等于 a,那么这个数就叫做 a的立方根 (也叫做三次方根 ). 一个正数有两个平方根