reducingppidscanning(ppt29)-经营管理(编辑修改稿)内容摘要:

Developing Items Impletement Date PICa. Change the PPID code from 39 to 128 Little zero area Nov. 20 39。 01 RD/Jade Kaob. Printing operation standardize Printing quality Dec. 1 39。 01 Bar code center/ Kate Guc. Training the printing operator Printing quality Dec. 1 39。 01 TE/Satchd. Printing equipment maintenance plan Printing quality Nov. 25 39。 01 TE/Satch Hee. Bar code center room controlling Printing quality Mar. 1 39。 01 Bar code center/Edward Dingf. Material quality improvement Printing qualityamp。 effect Dec. 28 39。 01 Bar code center/Kate Gug. Sampling inspection plan Inspection method Nov. 10 39。 01 QC/Javy Leeh. Inspecting scanner development Inspection method Feb. 10 39。 01 TE/Satch He。 QC/Javy LeeI. PPID Locatin design changing Packing method Nov. 20 39。 01 RD/Jade Kao2020/9/18 2020 LiteOn DELL CQS QIT TEAM 13 taken:  Printing code: a1. Changed PPID printing code from 39 to 128 for all DELL models。 a2. Set smaller word size on labels, changing from 8 size to 6 size.  Based on these, we got wider zero area at both left and right sides of PPID label (from to more than 3mm), which improved the PPID scanning level. (R/D Jade Kaoamp。 BCC Kate Gu Nov. 20 „00 implementing) 2020/9/18 2020 LiteOn DELL CQS QIT TEAM 14 taken:  Procedure: b1. Set up a a procedure to define the printing and inspecting standard, and listed it to both bar code center and IPQC PPID inspector。 (MI06 BarCode Center Operation Standard) b2. Show MOI to each operator for printing.  Got unity standards, smooth bar code label printing operation. (BCC Kate Gu Dec. 01 „00 implementing) 2020/9/18 2020 LiteOn DELL CQS QIT TEAM 15 taken:  Training: c1. Retrain the new operators to print the PPID labels quickly and skillfully。 c2. Train two special operators to manage the printer‟s settings for maintenance.  Share with skillful technology and adjust the printer while necessary to make sure the printer be in proper status. (TE Satch He Dec. 10 „00 implementing) 2020/9/18 2020 LiteOn DELL CQS QIT TEAM 16 taken:  Printer Maintenance Plan: d1. Request the operator to do daily maintaining。 d2. Engineer do monthly maintaining。 d3. Replace the key part in the printer termly, for example, printing needle three months once。 d4. Keep buffer for the key parts of the printer.  Make sure the printer is in the best printing status. (TE Satch He Dec. 20 „00 implementing) 2020/9/18 2020 LiteOn DELL CQS QIT TEAM 17 taken:  Bar code ce。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。