数控机床外文翻译-数控设计(编辑修改稿)内容摘要:

le workpieces are being machined. With continuouspath, or contouring, systems the position of the tool relative to the workpiece is specified by a series of coordinates, and the control system is designed to follow a path between these points by interpolation. Some machines follow a straightline path (linear interpolation)。 others follow a curved path (circular or parabolic interpolation). Numerical control can be applied to motions along or about any axis, but two or threeaxis control systems are the most mon. In general, verticalmilling machines and lathes utilize continuouspath, or contouring control. Verticaldrilling machines jig borers, and small milling machines often use positional control. One sophisticated form of NC machine is known as the machining center. This machine is generally a verticalmilling machine with several axes of control and with automatic toolchanging facilities. The tools are usually held in a rotary magazine, and tool changes are manded by the punched tape. Thus, with a machining center a plicated workpiece can be pletely machined on all faces except the base through a bination of milling, drilling, boring, facing, reaming, and tapping operations. This type of system is therefore most suitable for the batch production of main ponents. A further refinement o。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。