机电自动化专业毕业设计(论文)外文资料翻译(编辑修改稿)内容摘要:
interrupt 1) T0(timer 0 external input) T1(timer 1 external input) WR(external data memory write strobe) RD(external data memory read strobe) RST Reset input. A high on this pin for two machine cycles while the oscillator is running resets the device. ALE/PROG Address Latch Enable is an output pulse for latching the low byte of the address during accesses to external memory. This pin is also the program pulse input (PROG) during Flash programming. In normal operation, ALE is emitted at a constant rate of 1/6 the oscillator frequency and may be used for external timing or clocking purposes. Note, however, that one ALE pulse is skipped during each access to external data memory. If desired, ALE operation can be disabled by setting bit 0 of SFR location 8EH. With the bit set, ALE is active only during a MOVX or MOVC instruction. Otherwise, the pin is weakly pulled high. Setting the ALEdisable bit has no effect if the microcontroller is in external execution mode. PSEN Program Store Enable is the read strobe to external program memory. When the AT89C52 is 4 executing code from external program memory, PSEN is activated twice each machine cycle, except that two PSEN activations are skipped during each access to external data memory. EA/VPP External Access Enable. EA must be strapped to GND in order to enable the device to fetch code from external program memory locations starting at 0000H up to FFFFH. Note, however, that if lock bit 1 is programmed, EA will be internally latched on reset. EA should be strapped to VCC for internal program executions. This pin also receives the 12volt programming enable voltage (VPP) during Flash programming when 12volt programming is selected. XTAL1 Input to the inverting oscillator amplifier and input to the internal clock operating circuit. XTAL2 Output from the inverting oscillat or amplifier. Special Function Registers A map of the onchip memory area called the Special Function Register (SFR) space is shown in Table 1. Note that not all of the addresses are occupied, and unoccupied addresses may not be implemented on the chip. Read accesses to these addresses will in general return random data, and write accesses will have an indeterminate effect. User software should not write 1s to these unlisted locations, since they may be used in future products to invoke new features.。机电自动化专业毕业设计(论文)外文资料翻译(编辑修改稿)
相关推荐
发展符合酒店行业的经营特征。 酒店业是 “ 重资产 ” 的行业,所需资本只能依靠社会的各行各业,其数额之大、地域之广,任何酒店集团都无法系统覆盖。 而酒店经营是 “ 轻资产 ” 的领域,可以发展成为依靠 “ 软实力 ”的专业化、产业化的公司运作,实质上是酒店业社会化分工和规模化运作的需要。 随着 “ 软实力 ” 的传播和发展,酒店的价值创造途径就从内部价值链扩大到集团化的其他成员酒店中
场调查,本项目位于杭州动物园内, 周围无敏感点。 4 第四章 环 境影响 分析 主要结论 废气 本项目建成后,动物园食堂 厨房油烟废气经净化装置处理后排放,排放量为, 排放浓度为 , 低于 《饮食业油烟排放标准》 中 油烟 最高允许排放浓度,符合排 放标准要求。 废水 本项目建成后产生的废水主要为工作人员生活污水及猩猩馆清洗废水, 项目位于杭州动物园内,项目产生的厕所污水经化粪池处理后
单位进行编写。 综上可见,项目的建设符合各项审批原则,若建设单位能在本项目建设中认真执行环保 “三同时 ”,具体落实本环评中提出的各项污染防治措施,从环保角度看,本项目建设是可行的。 杭州胜利锅炉有限公司 新增年产 50 台 /套余热发电锅炉技改项目环境影响评价报告书 3 第二章 总 则 编制依据 国家法律、法规、规章 评价因子与评价标准 评价因子 (1) 地表水环境 现状评价因子: pH、
( 3) 缺点: 哈尔滨理工大学课程设计说明书 9 9 1)皮带减速传递效率低故,障率高。 2)由于电机偏置,易震动,需加配。 3)皮带易打滑磨损。 哈尔滨理工大学课程设计说明书 10 10 第 3章 电动机的选择 概论 目前在家用电器中使用的电机分为直流电机、单相串激式电机。 直流电机使用干电池供电,通常在电动剃须刀、录音机、电动儿童玩具等小型器具中。 单相串激式的电机结构上与直流电机相似。
辨率 1 1 1 ℃ 8 8 8 Bit 重复性 177。 1 ℃ 精度 177。 1 177。 2 ℃ 量程范围 0 50 ℃ 响应时间 1/e(63%) 6 30 S 电源引脚 中原工学院信息商务学院课程设计(论文) 15 DHT11 的供电电压为 3-。 传感器上电后,要等待 1s 以越过不稳定状态在此期间无需发送任何指令。 电源引脚( VDD, GND)之间可增加一个 100nF 的电容
)可做水平运输,倾斜向上 (16176。 )和向下 ( 010 ~ 012 )运输,也可以转弯运输;运输距离长,单机输送可达 15km; ( 3)可露天铺设,运输线可设防护罩或设通廊; ( 4)输送带伸长率为普通带的 1/5 左右;其使用寿命比普通胶带长;其青岛飞洋职业技术学院毕业论文 第 6 页 成槽性好;运输距离大。 带式输送机的工作原理 带式输送机又称胶带运输机,其主要部件是输送带