磁感应电机软启动外文翻译(编辑修改稿)内容摘要:

ive greater narrowing, while somewhat broadens the function by taking the square root. In practice, the fuzzy rule sets usually have several antecedents that are bined using fuzzy operators, such as AND, OR, and NOT, though again the definitions tend to vary: AND, in one popular definition, simply uses the minimum weight of all the antecedents, while OR uses the maximum value. There is also a NOT operator that subtracts a membership function from 1 to give the plementary function. There are several different ways to define the result of a rule, but one of the most mon and simplest is the maxmin inference method, in which the output membership function is given the truth value generated by the premise. Rules can be solved in parallel in hardware, or sequentially in software. The results of all the rules that have fired are defuzzified to a crisp value by one of several methods. There are dozens in theory, each with various advantages and drawbacks. The centroid method is very popular, in which the center of mass of the result provides the crisp value. Another approach is the height method, which takes the value of the biggest contributor. The centroid method favors the rule with the output of greatest area, while the height method obviously favors the rule with the greatest output value. A soft starter is another form of reduced voltage starter for . induction motors. The soft starter is similar to a primary resistance or primary reactance starter in that it is in series with the supply to the motor. The current into the starter equals the current out. The soft starter employs solid state devices to control the current flow and therefore the voltage applied to the motor. In theory, soft starters can be connected in series with the line voltage applied to the motor, or can be connected inside the delta loop of a delta connected motor, controlling the voltage applied to each winding. Solid state switches. These Solid State Switches are phase controlled in a similar manner to a light dimmer, in that they are turned on for a part of each cycle. The average voltage is controlled by varying the conduction angle of the switches. Increasing the conduction angle will increase the average output voltage. Controlling the average output voltage by means of solid state switches has a number of advantages, one of the major advantages being the vast improvement in efficiency relative to the pr。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。