nx
ngs? Often, these buildings are pulled down after having stood empty without use for many years. was factory 798 built? Who designed it? • Factory 798 was built in the early 1950s. • It was designed
• radioactivity • outer space 2. The scientist’s name is similar to the English word for__________________. • something not old • something not short •being interested in something Sir Isaac Newton
(of something that is needed) Eg:The poor girl felt lonely because of a lack of care. up: (cause sb to )bee happier or more cheerful Eg:Try and cheer up a bit, life isn’t that bad! from:feel pain
表语从句 主语从句 主语从句 主语从句 宾语从句 宾语从句 介宾从句 表语从句 ⑵ 注意几组易混连词 whether与 if; that与 what的使用: 引导主语、表语、同位语 ,介宾从句时关联词只用whether不用 if 表“是否”。 引导动词宾语从句时whether, if均可。 *Whether… or not The question is whether the film is
rds lifted off, lifting off, separated from, soaring into, circled, circling, released, shaking, touched down Listen to the tape. Match the paragraphs with these headings. • a) Introduction • b) An
ro or heroine. 2. Work in pairs, using the above words to desribe the pictues. 1. Look at the pairs of adjectives and listent to the cassette to see w
____– what ________it and what we can do to _________and prevent it. We have in the studio Dr Klinsmann, an ________on stress. Good morning, Dr Klinsmann. Doctor: Good morning. Presenter: Dr
法。 • If he had followed the doctor’s advice, he would be all right now. • 2) 现在时与过去时混合使用。 If he could pass the exam now, he would have passed it last time. • 3)现在时与将来时混合使用。 If he were here now, he
inside,some in the box itself.,some in the usually find this large box in the _______. box light inside leave inside catch a cold open shelves kitchen refrigerators Listening: Object described
uld choose transportation according to reality(现实 ) Situation1:from Shanghai to London Situation2:from Chongqing to Chengdu Situation3:from Beijing to Guangzhou Situation4:from Dalian to Qingdao When