高二unit3intergratingskillsppt(nx)内容摘要:

ngs? Often, these buildings are pulled down after having stood empty without use for many years. was factory 798 built? Who designed it? • Factory 798 was built in the early 1950s. • It was designed by East German architects. 4. Why is it very different from Chinese architecture? The simple style of the buildings and the fact that they are German set them aside as very different from Chinese archite。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。