高一上
once played very was your listening every day that 53 me.” she said. “ In fact, it was your playing 54 gave me a meaningful autumn, ” I answered,“ Let’ s be friends.” The girl smiled, and so did I. I
ich D. for which 4. Last month, part of Southeast Asia was struck by floods, from____ effects the people are still suffering. A. that B. whose C. those D. what 5. American women usually identify
and a lot of factories ________. A. have been taken place。 have been set up B. have taken place。 have been set up C. have taken place。 have set up D. were taken place。 were set up 7. How long _____
h 搜寻,寻找 属于 3. return 作为报答 4. war 处于交战状态 5. than 少于 6. apart 拆开 of 看重,器重 重点句 型再现 William I, the King of Prussia, never that his greatest gift to the Russian people would have such an history.
”. A. he was feeling better than ever B. he wasn‟t a healthy man C. he was feeling worse than before D. he will be well again 59. From the last sentence of the passage, we learn the man_______ before
__ A. the teachers39。 salaries are not high enough. B. teacher39。 s salaries should be as high as CEO39。 s. C. the teachers work harder than CEO39。 s of panies. D. teaching is more important than any
fans this afternoon. 5. Businessmen play an important r_________ in the munication of different cultures. 6. He has changed so much that I did not r_______________ him at the first sight.. 7. Tom
生于 1898年 4月 17日。 刘家祖祖辈辈靠耕读勤俭持家,家境殷实。 刘放吾的父亲喜欢读书,经常以《朱子家训》及“曾文正治家之道”训导他们。 青少年时期的读书、务农和传统的家教,让沉默寡言的刘放吾养成了吃苦耐劳的生活作风和淡泊名利的人生态度。 1924年,黄埔军校成立。 “到黄埔军校去”成为当时年轻人最时尚的口号。 1926年 6月,刘放吾从湖南省桂阳蓝嘉联合中学毕业后
、互联网游戏、高清电影在线观看等将成为智能手机的主流应用 , 用户在乘坐公交、购物就餐时也可实现刷手机付费。 4G 技术的运用 ① 将拉动消费需求 , 催生增长热点 ② 可促进消费升级 , 带动产业转型 ③ 能改善消费环境 , 保障网络安全 ④ 会推动企业就业 ,增加居民收入 A.①④ B.②③ C.①② D.③④ 年 9 月 13 日,中共中央、国务院发布了《关于深化国有企业改革的指导意见》。
右下图为“某地等高线地形示意图”。 读图完成 16~ 17题。 ,其形成的外力作用是 是 2020年 11月 26日绿色和平组织志愿者在德班托起一个巨大的风力发电机模型(如图 12),呼吁前来参加气候变化大会的各 国政府采取措施减少对化石能源的依赖,保护全球脆弱地区和人群免遭伤害。 图 13为“碳循环示意图”。 读图完成 18~ 19题。 发风能资源,减少 CO2 排放,直接影响图 13