高二下
f 意为 ,后通常接 语气。 we rid of the smell of fish. (A 级 ) Para 4 Laurene McKays move so fast. (B 级 ) 【语法连接】表示否定意义的副词或连词放在句首,句子需要做部分倒装。 如: was up there in a flash. 译文: in a flash 意为: 我来译 转瞬间我的自行车不见了 Para 5
rience a real war. Hardly ever__________________________. don’t argue and I’ve never been in a flight either. I don’t argue and never_____________________. knew little about his plan.
1276 76 段双双 404 1299 77 夏磊 392 1329 78 贾丽 376 18 名次\ 人数 阶段前100名 前200 前300 前400 前500 前800 前1000 前1200 入班 0 7 12 18 25 44 55 63 期中 2 7 14 22 32 48 57 70 期末 2 8 14 21 30 51 63 69 期中 5 12 22 29 36 53 63
★ Introduction 1. 大自然开始袭击我们。 ______________________________ 【短语积累】 turn on (1)____________(2)______________ 译:① The dog turned on me and bit me in the leg. ________________ ② It’s dark. Please turn
Writing Competition. A. would not win B. would not have won C. would win D. would have won A small plane crashed into hillside five miles east of the city, all four people on board. A. killed B.
close B. told to。 closing C. asked。 to close D. said to。 please close 知识运用 :________________________________ ( )8. He asked , “ Are you a League member?” →He asked me _________. I a League member I a
n order to find Earth –like plas. permanent base will be set up on the moon in the next twenty years flights to other plas might take place sometime after . China`s contributions in space exploration
一般而言,政治结社包括参加政党活动和参加政治性的社会团体两大类。 • 公民通过某些途径运用某些形式表达自己的政治观点和态度,以便影响政府决策的行为方式即 政治表达。 公民政治参与的主要形式有 政治选举 政治结社 政治表达
行现代化建设取得的成就 实践证明: 只有在中国共产党的领导下,才能顺利进行社会主义建设 百年巨变得出的结论是:只有中国共产党才能领导中国人民 取得民族独立、人民解放和社会主义的胜利,才能开创建设有中国特色的社会主义的道路,实现民族振兴、国家富强、人民富裕。 —— 十五大报告:《高举邓小平理论伟大旗帜,把建设有中国特色社会主义事业全面推向
)两大主题: 和平问题和发展问题(含义) • ( 2)成为主题的原因: • —— 直接关系着人类的生存和发展,符合世界人民的根本利益,反映全世界人民的强烈愿望和普遍要求; • —— 在当代国际社会中,维护世界和平、促进共同发展具有了现实的可能性。 • ( 3)辩证看待和平与发展问题: • ( 4)国际局势的基本态势: • ( 5)解决和平与发展问题的根本途径: 和平与发展的关系 【 B】 •