端双
4082 CMOS 4输入端双与门
1、1B/821B/82989 85ns( ; 65 O 2010V, 5V F 100T 18V F 3A, ”F ”B”(1(1(4or 4081B 082B 081B 40820 0.5 20 0.5 18 0.5 10 55 125405C 65 150 to is a of at or in of is to SS 55 125405CO|5) (V) (A) (V)5 5 0 10