吡咯烷酮
l-吡咯烷酮羧酸的制备毕业论文(编辑修改稿)
idone carboxylic acid yield was the highest at the same time in the chloroform content is 48ml, the reaction temperature is 55 DEG C, and the reaction time is 4H was the highest, %. Keywords: