年产20000吨神峰山泉水项目可行性研究报告(编辑修改稿)内容摘要:
r ed tai l, The f ish, which has si nce been sent to a museum wher e it is bei ng exami ned by a scient ist, is cal ed an oar fish. Such creatures have r ar el y been seen ali ve by man as they live at a depth of si x hundr ed f eet. Lesson83 Af ter the el ecti ons 大选之后 The former Pr ime Mi ni st er , Mr Wentwort h Lane, was defeat ed in t he r ecent elect ions. He i s now r et ir ng f rom polit ical li fe and has gone abroad. My fr iend, Crawley, has always been a fanat ical opponent of Mr Lane39。 s Radi cal Pr ogr essi ve Party. Aft er the el ecti ons, Cr awl ey went to t he f ormer Pr ime Minister39。 s house. When he asked if Mr Lane li ved ther e, t he pol iceman on duty t ol d him t hat Mr Went wor th Lane, was def eated in t he r ecent el ecti ons. He is now reti ri ng f rom pol it ical li fe and has gone abroad. My fr iend, Cr awl ey, has al ways been a fanati cal opponent of Mr Lane39。 s Radi cal Pr ogressive Par ty. After the el ecti ons, Crawley went to t he f or mer Pri me Minister39。 s house. When he asked if Mr Lane lived ther e, the pol iceman on duty t ol d hi m that 7 程师及相关专业人员组成专门机构,负责编制本项目的可行性研究报告。 项目建设地点 建设规模与目标 本项目建设规模为扩建年产 20xx0 吨,分别生产 19 升 60万桶桶装, 600ml 1500 万瓶( 60万箱)瓶装优质 纯天然 山泉 水生产线。 主要 建设条件 资源 优势 本项目利用 出 自海拔 1300 米无人区的花岗岩山体中的山泉水,未经任何工业、农业和人畜污染,经国家权威机构检测,各项指标优于国家山泉水标准,是极为难得的纯天然饮用山泉水。 本项目是在现有年产 10000吨 纯天然 山泉水的基础上进行扩建,技术设备成熟 ,检测手段齐全, 生产 、 经营、 管理经验丰富。 好 市场 俏 本项目开发经营 10 年多,消费者一直反应良好,逐步形成了本公司自已独立的品牌和市场体系,产品畅销,销量与年倍增,销 售网点不断增加,供不应求,急需进行技术改造,扩大生产规模。 f i sh was caught near Madagascar . A smal fi shingboat was car ri ed mi les out t o sea by t he power ful fish as i t pulled on the line. Real izing that t hi s was no or di nary f ish, the fi sherman made every ef or t not to damage i t i n any way. When i t was event ual y brought t o shore, i t was found t o be over thir teen f et long. It had a head li ke a hor se, bi g bl ue eyes, shining sil ver skin, and a bright r ed tai l, The f ish, which has si nce been sent to a museum wher e it is bei ng exami ned by a scient ist, is cal ed an oar fish. Such creatures have r ar el y been seen ali ve by man as they live at a depth of si x hundr ed f eet. Lesson83 Af ter the el ecti ons 大选之后 The former Pr ime Mi ni st er , Mr Wentwort h Lane, was defeat ed in t he r ecent elect ions. He i s now r et ir ng f rom polit ical li fe and has gone abroad. My fr iend, Crawley, has always been a fanat ical opponent of Mr Lane39。 s Radi cal Pr ogr essi ve Party. Aft er the el ecti ons, Cr awl ey went to t he f ormer Pr ime Minister39。 s house. When he asked if Mr Lane li ved ther e, t he pol iceman on duty t ol d him t hat Mr Went wor th Lane, was def eated in t he r ecent el ecti ons. He is now reti ri ng f rom pol it ical li fe and has gone abroad. My fr iend, Cr awl ey, has al ways been a fanati cal opponent of Mr Lane39。 s Radi cal Pr ogressive Par ty. After the el ecti ons, Crawley went to t he f or mer Pri me Minister39。 s house. When he asked if Mr Lane lived ther e, the pol iceman on duty t ol d hi m that 8 交通方便 市场需求与 销售 方向 本项目 山泉水开发经营 10 年多来,经质检部门多次抽检, 水质的各项指标一直优于国家标准,而且广大消费者评价口感好,在 本地区 已有的几家山泉水、矿泉水、纯净水中最受 亲睐, 销量最大 ,外地不少经销商多次来本公司订货,但因目前生产规模供不应求,只能 以 满足本县范围 为主 , 部份 供应周边邻县。 本项目扩建完成后, 瓶装和桶装水 可 供应 全国各地。 今后如供不应求,可根据资金实力再次扩大到年产 10 万吨以上的生产 规模。 建设规模与产品方案 本项目在现有年产 10000吨 桶装山泉水 的基础上, 新 建厂房 300 平方米,新增各类设备 22台, 达到年产 20xx0吨,其中桶装水 60万桶,瓶装水 1500 万瓶( 60万箱 ) 的能力。 本项目产品为年产 20xx0吨, 为了提高产品的附加值,新 增瓶装水生产线, 完善 桶装和瓶装两个品种结构,其中 桶装水占总产量的 56%,瓶装水占 44 %,桶装水规格为 19 升标准加伦桶装,瓶装水规格为 600ml 装。 f i sh was caught near Madagascar . A smal fi shingboat was car ri ed mi les out t o sea by t he power ful fish as i t pulled on the line. Real izing that t hi s was no or di nary f ish, the fi sherman made every ef or t not to damage i t i n any way. When i t was event ual y brought t o shore, i t was found t o be over thir teen f et long. It had a head li ke a hor se, bi g bl ue eyes, shining sil ver skin, and a bright r ed tai l, The f ish, which has si nce been sent to a museum wher e it is bei ng exami ned by a scient ist, is cal ed an oar fish. Such creatures have r ar el y been seen ali ve by man as they live at a depth of si x hundr ed f eet. Lesson83 Af ter the el ecti ons 大选之后 The former Pr ime Mi ni st er , Mr Wentwort h Lane, was defeat ed in t he r ecent elect ions. He i s now r et ir ng f rom polit ical li fe and has gone abroad. My fr iend, Crawley, has always been a fanat ical opponent of Mr Lane39。 s Radi cal Pr ogr essi ve Party. Aft er the el ecti ons, Cr awl ey went to t he f ormer Pr ime Minister39。 s house. When he asked if Mr Lane li ved ther e, t he pol iceman on duty t ol d him t hat Mr Went wor th Lane, was def eated in t he r ecent el ecti ons. He is now reti ri ng f rom pol it ical li fe and has gone abroad. My fr iend, Cr awl ey, has al ways been a fanati cal opponent of Mr Lane39。 s Radi cal Pr ogressive Par ty. After the el ecti ons, Crawley went to t he f or mer Pri me Minister39。 s house. When he asked if Mr Lane lived ther e, the pol iceman on duty t ol d hi m that 9 厂址选择 工艺技术与设备工程方 案 方案 本项目引进国内 一流的 锰砂过滤 — 活性碳净化 — 精密过滤 — 隔膜 超滤 — 臭氧灭菌 检验 — 灌装等 工艺 技术。 本项目根据上述工艺方案, 原水加压选 用 国产 SZDO60型不锈钢离心清水泵,砂过滤选用 美国产 163440RT1465型全自动锰砂介质除铁锰器,活性碳净化 选 用美国产163440RT1465 型全自动活性碳过滤器, 微 过滤 选 用美国产滤芯 PX0520 型过滤器, 超过滤 选 用 美国产 OSMONICS 型(分子量 50000) ABS 泵、美国产 OSMONICS型滤芯 型绝对过滤器, 纯水泵选用国产 WBD70/065型不锈钢离心泵,纯水箱选用 3m3 不锈钢水箱, 臭氧 灭菌 机选用国产臭氧发生器, 桶装选用 国产 5加伦桶装全自动 不锈钢 灌装机,瓶装选用国产 600ml瓶装全自动不锈钢灌装机。 原辅材料与能原供应方案 本项目只需以山泉水为原料,辅助材料活性碳 只需一次购入,安装后可以再生 反复 使用, 水瓶和水桶 是 标准 的 塑料制品,有专业厂家生产供应。 节能、节水、安全卫生与消防 在节能方面, 本项目总装机容量 20KW,能耗低 ,年销售f i sh was caught near Madagascar . A smal fi shingboat was car ri ed mi les out t o sea by t he power ful fish as i t pulled on the line. Real izing that t hi s was no or di nary f ish, the fi sherm。年产20000吨神峰山泉水项目可行性研究报告(编辑修改稿)
相关推荐
止地球温暖化京都会议,《京都预定书》规定各国在 20xx20xx 年间要将温室气体的排放总量在 1990 年的基础上削减 %。 20xx 年 4月的 G20 峰会把减少化石能源消耗、发展可再 生能源、保护人类共同的地球作为首要任务。 我国于 20xx 年 1 月公布的《 “十二五 ”控制温室气体排放工作方案》明确提出,大幅度降低单位国内生产总值二氧化碳排放,到 20xx
品。 ( 6)青绿色陶土, Al2O SiO2 总量 %,熔剂总量达%,该陶 土矿物成分比较复杂,除了大量着色成分 Fe2OTiO2 以外, CaO 和 MgO 达到 %,原料中 %K2O 是钾长石年产 20xx 万件高档陶瓷酒瓶生产项目可行性研究报告 21 形式存在,相当于 25%的钾长石矿物量。 于 1170℃温度下煅烧原料呈融化状,并有粘滞发泡现象,呈深红色且带有黄色粘稠条纹。 (
作为农膜生产消费大国来讲,无论过去、现在、将来农用薄膜都是我国现代农业生产中不可缺少的重要生产资料。 目前,我国农用薄膜的年需求量以大于 15%的年增长率逐年递增,预计到 20xx年农用薄膜的市场需求量将超过 200万吨,市场前景十分广阔。 农膜市场大体上分为高档功能膜市场和低档普通膜市场。 高档功能 膜技术含量较高,市场需求量和生产供给能力都在逐年上升,利用日益发达的现代科学技术
生物柴油所具有的润滑特性可以减少发动机的磨损,从而延长发动机的使用寿命。 总之,生物柴油的这些优点使得它成为一种石化柴油的 良 好替代品,并且已经在很多国家使用,尤其是对环境比较重视的国家和地区。 3 生物柴油的基础知识 [5] 生物柴油最常用 的生产方法是采用酯交换反应。 所谓酯交换反应是指 甘油三酯与醇反应生成脂肪酸单酯(也称生物柴油)和甘油的一个反应 过程。 甘三酯作为油脂的主要组分
第二章 项目建设背景与必要性 项目建设背景 20xx 年 以来指导 ―三农 ‖工作的第 9 个中央一号文件 , 题为《关于加快推年产 20xx0 吨甜玉米深加工项目可行性研究报告 4 进农业科技创新持续增强农产品供给保障能力的若干意见》 于 2 月 1 日 由新华社受权发布。 文件 包括:加大投入强度和工作力度,持续推动农业稳定发展;依靠科技创新驱动,引领支撑现代农业建设;提升农业技术推广能力
也十分 鑫嘉城公司 汽车部件制造有限公司年产 2 万吨汽车零配件生产线扩建及技术改造产业化升级项目 6 可观。 (主要原材料价格上涨幅度较大) 存在问题及建议 (1)该企业是股份制民营企业 ,产权明晰 ,但在完善现代企业制度上要有所提高和突破。 ( 2)进一步加快汽车 零配 件市场的开发工作,瞄准国内外两大市场,努力提高市场竞争能力,扩大市场份额,增加企业的经济效益。 ( 3)加快人才开发和培养