项目设计外文翻译(编辑修改稿)内容摘要:
the earth and held close to the integration of landscaping and solar orientation results in a snug, yet fully day lit building in which all occupied spaces have a view out to the bay. At the same time, the collective effect of the bermed facade, a series of connected swales, and a green roof essentially eliminates the negative effects of storm water runoff on the bay by minimizing the amount of impervious surface. The site, which was previously a landfill for construction debris, contained a number of raw materials that were mined as part of the design team’s strategy to be resourceful and keep costs contained. Two examples of this reuse include: old concrete slabs that were crushed and utilized as structural fill below the new slab。 and old granite curbing from downtown Providence that was reclaimed as seating for the outdoor amphitheater. The soil itself was repurposed as fill for the earthen berm and the entire site was capped with dredged material from the bay, once the negative effects of the landfill had been remediated. At the outset of the project, the design team and the owners had little information on the site so the initial predesigned work focused on understanding its assets, as well as the challenges it wou。项目设计外文翻译(编辑修改稿)
相关推荐
(2) 通过梁斜截面抗剪设计初步确定 ,同时应满足截面的正截面和斜截面抗弯承载力要求 ,采用梁抵抗弯矩图应覆盖计算包络图的原则来解决。 (3) 预应力损失:预应力钢筋与管道壁间的摩擦引起的预应力损失;锚具变形、钢丝回缩引起的预应力损失;分批张拉时混凝土弹性压缩引起的应力损失;预应力筋松弛引起的应力损失;混凝土收缩、徐变引起的预应力损失等等。 (4) 钻孔灌注桩的单桩轴向受压容许承载力为:
高产优质牧草饲料作物引种筛选及奶牛现代化饲养管理技术项目商业计划书 高产优质牧草饲料作物引种筛选及奶牛现代化饲养管理技术项目商业计划书指定联系人: 务:畜牧师电话号码: 真: 址:畜牧草良种繁殖 场国家 城市:中华人民共和国邮政编码:企业概况本场名 畜牧草良种繁殖 场(简称“场”),位于 陲,与 壤,总面积 152 平方公里,平均海拔 1760 米;地貌属中山山原,成丘状,坡平缓
特点: (1)施工平稳可靠,不需要大型起重设备; (2)桥梁整体性好,施工中无体系转换,不产生恒载徐变二次力,施工方便; (3)需要大量施工支架,跨河搭设影响通航与泄洪,跨路搭设影响交通; (4)施工期长,施工费用高,施工场地占用大,施工管理复杂。 混凝土浇筑方式是支架施工的另一关键。 以大跨径预应力混凝土箱形截面连续梁桥为例,混凝土浇筑可分多种进行。 一种是水平分层浇筑、即先浇筑底板
elated both to particular scheduled activities and to particular cost accounts. In addition to cost amounts, information on material quantities and labor inputs within each. job account is also
高科技有限公司商业计划书 天津晶岭高科技有限公司地址:天津市红桥区河北工业大学东院电话:(022 )26564423 26556455传真:(022 )26556455联系:(北京)刘钠 13701024365商 业 计 划 书呈送:投资方版本号:定联系人 刘钠职务电话号码 86 10 64262196手机 13701024365电子邮件 址 朝阳区樱花东街 12 号国家、城市 中国
可施以 14 点焊以保证骨架的几何形状。 钢筋焊接 采用 闪光接触焊时,接头处不得有横向裂纹 ;采用 电弧焊 时, 接头焊缝平整不得有较大的缺陷、焊瘤,裂纹 , 采用挤压连接器连接按规范要求进行。 高性能砼施工工艺、方法 水泥 、 粗 细 骨料 、 水 、粉煤灰、 外加剂 均经 经 进场材料复检合格,经向监理工程师报验后 ,方准使用, 原材料进场见证试验频次符合要求, 对 试验 不合格的 或未