尺寸标注及注释培训讲义(编辑修改稿)内容摘要:

aution, though, as slotted holes do not adequately retain large wiring bundles Detailing and Dimensioning Training  Dimensioning:  Dimensioning wire assemblies is acplished with two different tolerance systems。 clip tolerance and cut length or takeout tolerance.  Nominal dimensions for wire assemblies are selected by determining the minimal dimension from layout drawings and design aid bucks, then adding in the minus cutlength tolerance. Therefore a wire harness built to nominal length would seem long Detailing and Dimensioning Training  Dimensioning Cont. :  There is an interdependent relationship between the clip tolerance and the cutlength tolerance which must be examined during the design. The application of the clip tolerance and the takeout tolerance on the wire assembly drawing determines how well the wire harness fits by specifying where the cut length is positioned in the vehicle. Dimensioning multiple retainers from a mon fixed point aids in manufacture of the wire harness but spreads the cut length tolerance between the retainers. The design engineer needs to examine the effect this has on wire harness fit versus a retainer to retainer dimensioning scheme Detailing and Dimensioning Training  Dimensioning Methods 110 110 110 110 110 Me thod 1。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。