研版高考英语选修6module6warandpeaceintroductionword学案内容摘要:

d by the enemy, we found ourselves outside a peaceful village in ,就在我们接到加入 D日登陆部队的机密命令后两天,经过一天的战斗,并亲眼目睹我的很多朋友被敌军残杀后,我们发现我们来到了一个宁静的法国村庄外面。 【例句探源】 ①To his astonishment , the keys were in the door. = To the astonishment of him, the keys were in the door. ②Much to everyone’s astonishment , the plan succeeded. ③To the curiosity of everyone , his father was not angry over what he had done. 使每个人好奇的是,他的父亲并没有因为他做的事而生气。 【即境活用】 9. To our ________, the puter doesn’t function again. A. disappointment B. Disappointing C. disappointed D. delight 理 1.【教材原句】 The operation was extremely dangerous and many soldiers were killed before they even got off the boats.(P72) 军事行动特别危险,许多士兵甚至还没来得及下船就被杀死了。 【句法分析】 此句为一个主从复合句, before 引导一个时间状语从句,意为 “ 还没有来得及 „„ 就 „„”。 before用作连词句型归纳: (1)before „„ ①Bef ore I could get in a word, he had measured me. 我还没来得及插话,他就给我量好了尺寸。 (2)It will be+时间+ before...还有多长时间 „„ 才 „„ ②It will be 4 years before he graduates. 他还有四年时间才能毕业。 (3)had done some time before „„ 才 „„ ③We had sailed four days and four nights before we saw land. 我们航行了四天四夜才见到陆地。 (4)had not done...before...不到 „„ 就 „„ ④We hadn’t run a mile before he felt tired. 我们还没走到一英里路他就觉得累了。 (5)It was not+一段时间+ before 不多久就 „„ ⑤It wasn’t two years before he left the country. 还没到两年他们就离开了那个国家。 【即境活用】 10. Someone called me up in the middle of the night, but they hung up ________ I could answer the . as B. sinceC. until D. before was not long ________, his name became a household word. A. when B. After C. before D. Since 2.【教材原句】 The survivors lay on the beach, exhausted and shocked.(P73) 死里逃生的战士躺在海滩上,疲惫不堪,心有余悸。 【句法分析】 exhausted and shocked 是形容词短语作状语,表示死里逃生的战士躺在海滩上时。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。