外研版高中英语必修4module5atripalongthethreegorges之三内容摘要:
test最晚 • ① He had been dead for at least a fortnight. • 他死了至少有两星期了。 • ② That suitcase looks must cost 100 dollars at least. • 那个箱子看样子很贵,至少要 100美元吧。 • ③ I can pay you 10 pounds at (the) most. • 我最多付你 10英镑。 • ④ There were only 30 people at the meeting at (the) most. • 最多有 30个人参加了那个会议。 • go through • (1)经历,经受 • He would go through fire and water for his country. • 他愿为国家赴汤蹈火。 • He has gone through a great deal in his life. • 他的一生经历了许多的事情。 • (2)仔细检查,审查 • They went through our luggage at the customs. • 海关人员仔细地检查了我们的行李。 • After you finish the test, go through it again to look for mistakes. • 作完试卷后再看一遍,以减少错误。 • (3)游览 • We spent several days going through all related reference 间查阅了相关的参考资料。 • (4)通过,穿过 • Can the table go through the door? • 这张桌子能过得了那扇门吗。 • (5)花完,用掉 • How long will it take you to go through the book? • 看完这本书你得用多长时间。 • 1. —I’ m sorry for the trouble. • —Not________. • A. at least B. in least • C. at the least D. in the least • 【 解析 】 not in the least一点也不,相当于 not at all,符合语境。 • 【 答案 】 D • 2. —Has every student passed the final exam? • —, ________three from each class has failed. • A. no least than B. no more than • C. at least D. by least • 【 解析 】 at (the) least意思是 “ 至少,不少于 ”。 no more than的意思是 “ 仅仅,只有 ” ,含有嫌该数字少的意味,而unfortunately的意思是 “ 不幸地 ” ,含义是不希望有学生考试不及格。 • 【 答案 】 C • 3. —The woman biologist stayed in Africa studying wild animals for 13 years before she returned. • —Oh, dear。 She________a lot of difficulties! • A. may go through • B. might go through • C. ought to have gone through • D. must have gone through • 【 解析 】 “ must have+过去分词 ”表示 “ (过去 )一定 „„” ,是对过去发生的动作的肯定判断。 根据上文 “ studying wild animals for 13 years” 可判断出一定遇到了许多困难。 • 【 答案 】 D • 4. She________his jacket and at last found the keys. • A. went through B. went over • C. went away D. went down • 【 解析 】 句意为: “ 她仔细地检查了他的夹克衫口袋,终于找到了钥匙。 ” • 【 答案 】 A • 1. He and a colleague________ ________ ________two years there teaching English at a teacher training college. • 他和另一位同事将在那里的一所教师进修学院教两年英语。 • 【 答案 】 were to spend • 2. Nearly 100 million people live here,________ ________ ________ ________ ________ ________. • 差不多一亿人口住在此地,绝大多数在东部。 • 【 答案 】 most of them in the east • 3. The ge________to 350 feet as the river rushes________the twomilehigh mountains. • 当急流穿过两英里高的峡谷时,峡谷变窄了,只有 350英尺。 • 【 答案 】 narrows; through • 4. They could see the mountain________ ________ peaks were shining________ ________ ________. • 在远处他们能看到那座山。 那些山峰在阳光下闪闪发光。 • 【 答案 】 in the distance; in the sunlight • Nearly 100 million people live here,most of them in the 在此地,绝大多数在东部。 • most of them in the east是独立主格结构,在句中作状语。 • 独立主格结构的构成及用法如下: • (1)名词或主。外研版高中英语必修4module5atripalongthethreegorges之三
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。