牛津译林版高中英语必修二unit2wishyouwereheregrammarandusage课件2内容摘要:

re going to+do was/were to+do was/were about to+do was/were doing A. Tick the sentences which express future in the past. • Colin and I would be in Africa the next Monday. • John was always going to the beach when he was a kid. • Jennifer was going to Hawaii on holiday. • I was having dinner with some friends when she called me. • Toby and Colin were to fly to Morocco the next day. B. Colin wrote in his diary about the sunrise he and Toby saw in the desert. Complete his diary entry with expressions from the box. wouldn’t see, were going to watch, wouldn’t get up, would never fet, would fall down, would last, would stop, were about to turn off ① were going to watch ② were about to turn off ③ would last ④ wouldn’t see ⑤ wouldn’t get up ⑥ would stop ⑦ would fall down ⑧ would never fet Check your answers! Finish the passage according to Para 2 on Page 22. Dear Karen How are you? I’m going to tell you something about Toby’s adventure in Africa. He said they __________ London on 15th July and they ________ to Morocco, in North Africa. They _________________ on camels through the Sahara Desert. It is the biggest d。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。