德州一中选修9module5thefirstamericans之三内容摘要:
at starvation warrior 1. Sitting Bull was a _________ Native American chief. 2. thousands of people died of __________ on the long journey. 3. The Native Americans received very _______ treatment from Europeans 4. A _______ is a strong and very brave fighter. 5. The village was attacked and our horses and other ________ were stolen. 6. After losing the battle, the tribe were forced to _______and move to the west. 7. _______ people move around and do not settle in one place. 8. The Iroquois was a strong ________ ___of several different tribes in the east. 9. A few brave men went out at night to _______ one of the Spanish village and bring back food. people refused to ______ to Christianity, they were often killed. legendary starvation brutal warrior livestock Nomadic retreat collaboration raid covert Americans were once called “Indian。德州一中选修9module5thefirstamericans之三
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。