人教版高中英语选修六unit5thepowerofnature第4课时内容摘要:

肯定会;必然会 ”。 1. glance through/at/down/over sth 浏览;粗略地看 ① He glanced through the provincial news, and then placed the paper on the tea table. 他翻看了本省新闻 , 把报纸放在茶几上。 ② Sam took the letters from Lord, glanced through them and read aloud. 萨姆从洛德手中接过那些信 , 很快地浏览一遍 , 并大声念出来。 【 知识运用 】 (1)Next door, the little general store had a few copies of that day39。 s newspaper on sale. The boys picked up a copy and________it. A. glanced through B. looked into C. got through D. went through 答案: A 本题题意:隔壁的那家杂货铺里有当天的报纸 , 孩子们拿起一份来 , 匆匆地看了一遍。 glance through表示 “ 浏览;粗略地看 ”。 (2)She________through the letter, which was formal in its wording. A. glared B. glanced C. gazed D. stared 答案: B 本题题意:她匆匆看了一遍信 , 这是封言辞非常正式的信。 glance through表示 “ 浏览;粗略地看 ”。 2. give birth to 1)生孩子;产仔 ① She gave birth to a fine healthy baby. 她生了个漂亮健康的婴儿。 ② How often does your dog give birth to puppies? 你的狗隔多久下一窝小狗。 2)产生;形成 ① It gave birth to many unpleasant stories. 这又引出了许多令人不快的故事。 ② The inflation gave birth to a smoldering feeling of discontent. 通货膨胀引起了一种郁积的不满情绪。 【 知识运用 】 (1)The toolbar________the button, a happy marriage between a button and an icon. A. stuck to B. gave birth to C. looked forward to D. referred to 答案: B 本题题意:工具栏的出现带来了图标按钮 ,它是按钮和图标之间一次愉快的联姻。 give birth to表示“ 产生;形成 ”。 (2)Women exposed to air pollution during pregnancy are more likely to give birth________children with heart defects, researchers reported on Saturday. A. to B. on C. with D. for 答案: A 本题题意:周六 , 有研究人员报告 , 接触污染空气的孕妇很可能生下患有心脏缺陷的孩子。 give birth to表示 “ 生孩子;产仔 ”。 1. Among the rare animals are cranes, black bears, leopards and tigers. 珍稀动物有白鹤 、 黑熊 、 豹子和虎。 【 知识剖析 】 为了使上下文紧密衔接 , 本句话把表语 among the rare animals置于句首 , 句子的主语和谓语采用了完全倒装结构。 在英语中 , 如果主语较长或句子结构较复杂 , 担任表语的形容词 、 分词 、 不定式 、 介词短语或副词等可以置于句首 , 采用完全倒装结构。 例如: ① Gone are the days when he was looked down upon. 他被人瞧不起的日子已经一去不复返了。 ② In the armchair lay a cat, half asleep. 一只猫躺在椅子上 , 半睡半醒。 ③ Standing around the teacher were her students. 老师周围站着的都是她的学生。 ④ Also discussed were the problems we had met with in our studies. 同时还讨论了我们在学习中碰到的问题。 ⑤ First to unfold was the map of the world. 首先要打开的是世界地图。 【 知识拓展 】 完全倒装是指将句子中的谓语动词全部置于主语之前。 此结构通常只用于一般现在时和一般过去时。 常见的结构还有: 1. There be句型 (be可换成 live, lie, stand, remain, exist, e, go, seem/appear/happen/use。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。