英语必修ⅴ牛津译林版unit1阅读课件1共26张ppt内容摘要:

veryone how badly she had done in the Maths test. The second letter: Why did Andrew shout at Matthew after the match? What did Matthew think about losing the match? What kind of boy is Matthew? Why did Andrew shout at Matthew after the match? He thought Matthew played badly and did not try hard enough. As a result, they lost the game. What did Matthew think about losing the match? He thought it wasn’t his fault. What kind of boy is Matthew? He is usually cheerful and outgoing. Since primary school Annie and Sarah have been good friends. One day, Sarah had a surprise but easy English test, so she was not worried about the results. After she failed in the maths test, she went to the playground to be cheerful. F F T Hannah promised not to tell anyone else but her family about the poor marks. The next day。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。