20xx人教版英语八年级下册unit1what’sthemattersectiona1课件内容摘要:

Roleplay the conversation. Mandy: Lisa, are you OK? Lisa: I have a headache and I can’t move my neck. What should I do? Should I take my temperature? Mandy: No, it doesn’t sound like you have a fever. What did you do on the weekend? Lisa: I played puter games all weekend. Mandy: That’s probably why. You need to take breaks away from the puter. Lisa: Yeah, I think I sat in the same way for too long without moving. Mandy: I think you should lie down and rest. If your head and neck still hurt tomorrow, then go to a doctor. Lisa: OK. Thanks, Mandy. Answer the questions. 1. What’s the matter with Lisa? 2. Did she have a fever? 3. What did she do the night before? 4. What does she need to do? 5. What should she do for now? 6. What should she do if things don’t get better? 1. What’s the matter with Lisa? 2. Did she have a fever? 3. What did she do the night before? She has a headache and can’t move her neck. No, she didn’t. She played puter games all weekend. 4. What does she need to do? 5. What should she do for now? 6. What should she do if things don’t get better? She needs to take breaks away from the puter. She should lie down and rest. She should go to a doctor. 1. What’s the matter? What’s the matter? 与 What’s wrong? 同义,均意为“怎么了。 ”,常用来询问疾病、事故伤害等。 如果表示某人怎么了,应该用 What’s the matter with sb.? 或 What’s wrong with sb.? 如: What’s the matter / What’s wrong with the old man? What’s the matter? 的答语通常有以下几 种: ① “ sb.+。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。